CONTENTS

  • 1. Introduction
  • 2. Specification
    • 2.1 Relevant Relationship, Relevant Relationship Change and Significant Date
      • 2.1.1 Relevant Relationship
      • 2.1.2 Relevant Relationship Change
      • 2.1.3 Significant Date
    • 2.2 PRS Instructions
      • 2.2.1 “Data Aggregator Appointment Details” Instruction Type
      • 2.2.2 “Data Collector Appointment Details” Instruction Type
      • 2.2.3 “Measurement Class in Registration Details” Instruction Type
      • 2.2.4 “Energisation Status in Registration Details” Instruction Type
      • 2.2.5 “GSP Group Details” Instruction Type
      • 2.2.6 “Line Loss Factor Class Details” Instruction Type
      • 2.2.7 PRS Refresh
    • 2.3 HH Data Collector Interface
    • 2.4 Instruction Life Cycle Processing
      • 2.4.1 Instruction File Processing
      • 2.4.2 Instruction File Processing - Problem Resolution
      • 2.4.3 Instruction Processing
      • 2.4.4 Instruction Processing - Problem Resolution
  • APPENDIX A – INSTRUCTION FORMAT
  • APPENDIX B - EXAMPLES
    • 1. New Metering System
    • 2. Change of Line Loss Factor Class
    • 3. Change of Supplier and Data Aggregator
    • 4. Change of Supplier with no change of Data Aggregator
    • 5. Change of Data Aggregator with no Change of Supplier
    • 6. Correction to Relationship Start Date
    • 7. Registration Withdrawn
    • 8. Details sent to incorrect Data Aggregator

Half Hourly Instruction Processing Specification V3.0

Effective From Date:13/08/2024
Status:LIVE
Other versions
Download