HomeRulebook HomeBalancing and Settlement CodeBSCBSC Section T Settlement and Trading Charges
CONTENTS
- SECTION T: SETTLEMENT AND TRADING CHARGES
- 1. GENERAL
- 1.1 Introduction
- 1.2 Obligation and entitlement of Parties
- 1.3 Data requirements
- 1.4 Data receipt and validation
- 1.5 Market Index Definition Statement
- 1.6 Provision of Market Index Data
- 1.6A Loss of Load Probability Calculation Statement
- 1.7 Single imbalance price
- 1.8 De Minimis Acceptance Threshold
- 1.9 Continuous Acceptance Duration Limit (CADL)
- 1.10 Price Average Reference Volume
- 1.11 Replacement Price Average Reference Volume
- 1.12 Value of Lost Load
- 1.13 Annex T-2
- 1.14 Replacement Reserve Schedule Methodology Document
- 1.15 Winter Contingency BM Units
- 1.16 Supplier Compensation Reference Price
- 2. ALLOCATION OF TRANSMISSION LOSSES
- 2.1 Delivering and Offtaking Trading Units
- 2.2 Transmission Loss Factors
- 2.3 Determination of the Transmission Loss Multipliers
- 3. SETTLEMENT OF BALANCING ACTIONS
- 3.1 Conversion of Data Received from the NETSO
- 3.2 Establishment of final physical notification (FPNij(t))
- 3.3 Establishment of Bid-Offer Volume (qBOnij(t))
- 3.4 Establishment of Acceptance Volume (qAkij(t))
- 3.4A Establishment of Bid-Offer Upper Range (BOURnij(t)) and Bid-Offer Lower Range (BOLRnij(t)) in relation to FPN and Submitted Bid-Offer Pairs
- 3.4B Creation of Bid-Offer Pairs
- 3.5 Establishment of Bid-Offer Upper Range (BOURnij(t)) and Bid-Offer Lower Range (BOLRnij(t)) in relation to Unsubmitted Bid-Offer Pairs
- 3.6 Determination of Accepted Bid-Offer Volume (qABOknij (t))
- 3.7 Accepted Offer Volume (qAOknij (t)) and Accepted Bid Volume (qABknij (t))
- 3.8 Determination of Period Accepted Offer Volume (QAOknij), Period Accepted Bid Volume (QABknij), Period RR Accepted Offer Volume (RRAOknij) and Period RR Accepted Bid Volume (RRABknij)
- 3.9 Determination of Period BM Unit Total Accepted Offer Volume (QAOnij), Period BM Unit Total Accepted Bid Volume (QABnij), Period RR Total Accepted Offer Volume (RRAOnij), Period RR Total Accepted Bid Volume (RRABnij) and Quarter Hour RR Activation Volume (RRAViJ)
- 3.10 Determination of Period BM Unit Offer Cashflow (COnij) and Period BM Unit Bid Cashflow (CBnij)
- 3.11 Determination of Period BM Unit Cashflow (CBMij)
- 3.11A Determination of Quarter Hour RR Cashflow (CCRiJ)
- 3.11.B Determination of Period RR BM Unit Cashflow (CRRij)
- 3.12 Determination of Total System BM Cashflow (TCBMj) and Daily Party BM Unit Cashflow (CBMp)
- 3.12A Determination of Network Gas Supply Total Bid Payment
- 3.13 Determination of Reserve Scarcity Price (RSVPj)
- 3.14 Determination of STOR Action Price (STAPtj)
- 3.15 Determination of System and Balancing Demand Control Volumes (QSDCcj and QBDCcj)
- 3.16 Not used.3.17 Determination of Deemed Standard Product Shape (qDSPJij(t))
- 3.18 Determination of Deemed Standard Product Volume (qDSPVJij(t))
- 3.19 Determination of Deemed Standard Product Offer Volume (qDSPOJij(t)) and Deemed Standard Product Bid Volume (qDSPBJij(t))
- 3.20 Determination of Period Deemed Standard Product Offer Volume (DSPOJij) and Period Deemed Standard Product Bid Volume (DSPBJij)
- 3.21 Determination of Total Period Deemed Standard Product Offer Volume (TDSPOij) and Total Period Deemed Standard Product Bid Volume (TDSPBij)
- 3.22 Determination of Replacement Reserve Instructed Offer Deviation (IODij) and Replacement Reserve Instructed Bid Deviation (IBDij)
- 3.23 Determination of Replacement Reserve Period Instructed Offer Deviation Cashflow (CDOij)and Replacement Reserve Period Instructed Bid Deviation Cashflow (CDBij)
- 3.24 Determination of the Replacement Reserve Period Instruction Deviation Cashflow (CDRij)
- 3.25 Determination of Total System RR Cashflow (TCRRj), Daily Party RR Cashflow (CRRp) and Daily Party RR Instruction Deviation Cashflow (CDRp)
- 4. SETTLEMENT CALCULATIONS
- 4.1 Treatment of Interconnector BM Units
- 4.2 Determination of BM Unit Metered Volume (QMij) for Supplier BM Units
- 4.2A Determination of BM Unit Metered Volume (QMij) for Secondary BM Units
- 4.3 Determination of Information Imbalance Volumes (QIIij) and Charges (CIIij)
- 4.3A Determination of Market Price (MPj)
- 4.3AA Determination of Deviation Volume (QDEij) for Trading Secondary BM Units
- 4.3B Determination of Period Supplier BM Unit Delivered Volume (QBSDij) for Secondary BM Units
- 4.3C Determination of Period Secondary BM Unit Supplier Compensation (QSVij)
- 4.4 Determination of Energy Imbalance Prices (SBPj and SSPj)
- 4.5 Determination of Credited Energy Volumes (QCEiaj) for each Energy Account
- 4.6 Determination of Energy Imbalance (QAEIaj) for each Energy Account
- 4.7 Determination of Energy Imbalance Cashflows (CAEIaj and TCEIj)
- 4.8 Non-Delivery Rule and Calculations
- 4.9 Determination of System Operator Cashflow (CSOj)
- 4.10 Determination of Residual Cashflow Allocations
- 4.11 Determination of Compensation Cashflow Allocations
- 5. SETTLEMENT
- 5.1 Responsibility of SAA
- 5.2 Requirement to carry out Settlement Runs
- 5.3 Submission of Settlement data
- 5.4 Failure of SAA's systems, etc
- 6. ADDITIONAL CALCULATIONS
- 6.1 Determination of Trading Unit Export and Import Volumes (QTUErj and QTUIrj)
- 7 SUBMISSION OF REPLACEMENT RESERVE DATA TO THE SVAA
- 8 CALCULATION OF BM UNIT CHARGEABLE DEMAND FOR THE EMR SETTLEMENT SERVICES PROVIDER
- Annex T-1: Final Ranked Set of System Actions
- Part 1 – Derivation of Final Ranked Set of System Actions
- 1. INTRODUCTION
- 2. RANKED SETS
- 3. CADL FLAGGING
- 4. SO-FLAGGING
- 5. EMERGENCY INSTRUCTIONS
- 6. DE MINIMIS TAGGING
- 7. ARBITRAGE TAGGING
- 8. CLASSIFICATION
- 9. NIV TAGGING
- 10. REPLACEMENT PRICING OF SECOND-STAGE FLAGGED SYSTEM ACTIONS
- 11. PAR TAGGING
- Part 2 - Detailed Provisions
- 12. CADL FLAGGING
- 13. ARBITRAGE TAGGING
- 14. NIV TAGGING
- 15. REPLACEMENT PRICE
- 16. PAR TAGGING
- Part 3 – Terms for Reporting
- 17. Table of terms
- Annex T-2: Transmission Loss Factors
- 1. Introduction
- 1A. Transmission Loss Factors relating to the BSC Year commencing 1st April 2025
- 2. LFM Specification
- 3. Load Flow Model
- 4. Zones, Nodes and Mapping
- 5. Transmission Network Data and HVDC Boundary Data
- 6. Distribution Network Data
- 7. Sample Settlement Periods
- 8. Determination of TLFs
- 9. Determination of the Transmission Loss Factor Adjustment (TLFAS)
- 10. Role and powers of the NETSO
- AMENDMENT RECORD – SECTION T
BSC Section T: Settlement and Trading Charges V46.0
Effective From Date:28/09/2026
Status:LIVE
Other versions
Download