HomeRulebook HomeBalancing and Settlement CodeBSCBSC Section S 2 Supplier Volume Allocation RulesBSC Section S 2 Supplier Volume Allocation Rules V 30 0
CONTENTS
- ANNEX S-2: SUPPLIER VOLUME ALLOCATION RULES
- 1. GENERAL
- 1.1 Introduction
- 1.2 Interpretation
- 2. THE SUPPLIER METER REGISTRATION SERVICES
- 2.1 Provision of data
- 3. HALF HOURLY DATA COLLECTION AND AGGREGATION
- 3.1 Supplier’s responsibility for the collection and aggregation of half hourly data
- 3.1A Virtual Lead Party’s responsibility for the collection of half hourly data
- 3.2 Metered Data
- 3.3 Half Hourly Data Collection
- 3.4 Half Hourly Data Aggregation
- 3.5 Determination of Supplier’s Metered Consumption and/or Asset Meter Register Virtual Lead Party’s Consumption
- 3.6 Determination of BM Unit’s Metered Consumption
- 3.7 Estimation of Demand Disconnection Volumes
- 3.8 Estimation of BM Unit’s Demand Disconnection Volumes
- 3.9 Determination of Allocated Metering System Metered Consumption
- 3.10 Determination of Metering System Delivered Volumes
- 4. NON HALF HOURLY DATA COLLECTION AND AGGREGATION
- 4.1 Supplier’s responsibilities
- 4.2 Metered Data
- 4.3 Non Half Hourly Data Collection
- 4.4 Non Half Hourly Data Aggregation
- 4.5 Non Half Hourly Data Aggregation of Demand Disconnection Events
- 5. SUPPLIER VOLUME ALLOCATION DATA INPUT
- 5.1 Supplier Volume Allocation Standing Data
- 5.2 Supplier Volume Allocation Periodic Data
- 5.3 Reconciliation Allocation Data Input
- 6. PROFILE COEFFICIENTS
- 6.1 Making of determinations
- 6.2 Derivation of Settlement Register switching times for each Teleswitch Time Pattern Regime
- 6.3 Derivation of time pattern data
- 6.4 Rounding of Time Pattern data
- 6.5 Evaluation of Basic Period Profile Coefficients for each Time Pattern Regime
- 6.6 Calculation of Normal Register Profile Coefficients and Low Register Profile Coefficients for Switched Load Metering Systems
- 6.7 Calculation of Period Profile Class Coefficients for each Time Pattern Regime
- 6.8 Calculation of Daily Profile Coefficients
- 7. HALF HOURLY METERING SYSTEM CONSUMPTION
- 7.1 Determination of Half Hourly Consumption (Non Losses)
- 7.2 Determination of Half Hourly Consumption (Losses) by Supplier
- 8. NON HALF HOURLY METERING SYSTEM CONSUMPTION
- 8.1 Settlement Period consumption by Supplier
- 8.2 Settlement Period disconnection by Supplier
- 9. GSP GROUP CORRECTION
- 9.1 Determination of GSP Group Half Hourly Consumption
- 9.2 Determination of GSP Group Correction Factor
- 9.3 Determination of Corrected Component
- 9.4 Determination of Supplier Deemed Take
- 9.5 Determination of Non Half Hourly Supplier Deemed Take
- 9.6 Determination of BM Unit Allocated Demand Volume
- 9.7 Determination of Supplier Cap Take
- 9A Determination of the Supplier Quarterly Volume Report
- 10. VOLUME ALLOCATION RUNS
- 10.1 Supplier Volume Allocation Runs
- 10.2 Adjustment of BM Unit Allocated Demand Volumes
- 11. TRADING DISPUTES
- 11.1 Provision of Information
- 11.2 Rectification of Errors
- 12. DELAYS AND FAILURES
- 12.1 Aggregated Half Hourly Consumption Data
- 12.2 Aggregated Estimated Annual Consumptions and Annualised Advances
- 12.3 BM Unit Allocated Demand Volumes, DUoS Report and TUoS Report
- 12.4 Obligation to assist
- 13. DETERMINATION OF PERIOD BM UNIT GROSS STORAGE DEMAND FOR SVA STORAGE FACILITIES
- 13.1 General
- 13.2 Declarations
- 13.3 Suppliers’ Responsibilities
- 13.4 Half Hourly Data Aggregator’s Responsibilities
- 13.5 SVAA Responsibilities
- 13.6 Supplier Volume Allocation Runs
- 13.7 General Responsibilities in respect of SVA Storage Facilities
- 13.8 Powers of the Panel
BSC Section S-2: Supplier Volume Allocation Rules V30.0
Effective From Date:18/07/2022
Status:SUPERSEDED
Other versions
Download