CONTENTS

  • SECTION Q: BALANCING SERVICES ACTIVITIES
    • 1. INTRODUCTION
      • 1.1 Scope
      • 1.2 Interpretation
      • 1.3 Data submission by the NETSO
    • 2. DATA SUBMISSION BY LEAD PARTY
      • 2.1 Dynamic Data Set
      • 2.2 Maximum Export Limits and Maximum Import Limits
      • 2.3 Not Used
    • 3. FINAL PHYSICAL DATA NOTIFICATION SUBMISSIONS
      • 3.1 Application
      • 3.2 Final Physical Notification Data
    • 4. BALANCING SERVICES BID-OFFER SUBMISSION
      • 4.1 Bid-Offer Pairs
      • 4.2 Balancing Mechanism Default Data
      • 4.3 Replacement Reserve Bid Data Submission and Default Data
    • 5. BALANCING MECHANISM Bid-Offer Acceptance
      • 5.1 Bid-Offer Acceptances
      • 5.2 Data Consistency Requirements
      • 5.3 Acceptance Data
      • 5.4 Suspension of balancing mechanism
      • 5.5 Historic balancing mechanism prices
      • 5.6 REPLACEMENT RESERVE AUCTION RESULT DATA
    • 5A SUSPENSION OF THE TERRE MARKET
      • 5A.1 Outages of computer systems or TERRE Central Platform operator notification leading to the suspension of the TERRE Market
      • 5A.2 TERRE Market Suspension General Provisions
    • 6. SUBMISSION OF DATA BY THE NETSO
      • 6.1 Submission of data to the BMRA
      • 6.1A Submission of data to the ECVAA
      • 6.1B Submission of Transparency Regulation Data and EBGL Local Data to the BMRA
      • 6.2 Submission of Balancing Mechanism data to the SAA
      • 6.2A Submission of data to the CDCA
      • 6.2B Submission of Data to the SVAA
      • 6.2C Submission of Replacement Reserve data to the SAA
      • 6.3 Balancing Services Adjustment Data
      • 6.4 Applicable Balancing Services Volumes Data
      • 6.5 Not used6.6 Outages
      • 6.7 Static Function Loss of Load Probability
      • 6.8 Dynamic Function Loss of Load Probability
      • 6.9 Demand Control Instructions
    • 7. MANIFEST ERRORS
      • 7.1 Meaning of Manifest Error
      • 7.2 Claiming Manifest Errors
      • 7.3 Flagging Manifest Errors
      • 7.4 Determination of Manifest Errors
      • 7.5 Adjustments to Bid or Offer Price
      • 7.6 Error compensation amount
    • 8. COMPENSATION FOR OUTAGES
      • 8.1 General
      • 8.2 Claim for compensation following unplanned outage
      • 8.3 Compensation entitlements
    • 9. NOT USED10. NOT USED11. SUBMISSION OF INSIDE INFORMATION DATA
      • 11.1 Application
      • 11.2 Inside Information Data
      • 11.3 Submission of Data by BSCCo
      • 11.4 Submission of Data by Non-Parties
    • AMENDMENT RECORD – SECTION Q

BSC Section Q: Balancing Mechanism Activities V48.0

Effective From Date:25/06/2026
Status:LIVE
Other versions
Download