CONTENTS

  • SECTION P: ENERGY CONTRACT VOLUMES AND METERED VOLUME REALLOCATIONS
    • 1. GENERAL
      • 1.1 Introduction
      • 1.2 Authorisations - general
      • 1.3 Further provisions
      • 1.4 Single Relevant Contract Party
      • 1.5 Single Energy Contract Notification Agent or Single Metered Volume Reallocation Notification Agent
      • 1.6 Suspension of contract volume notification
    • 2. ENERGY CONTRACT VOLUMES
      • 2.1 Submission of ECVNA Authorisation
      • 2.2 Termination of ECVNA Authorisation
      • 2.3 Energy Contract Volume Notifications
      • 2.4 Not used
      • 2.5 Refusal and rejection for credit reasons
      • 2.6 Energy Contract Volume
    • 3. METERED VOLUME REALLOCATIONS
      • 3.1 Submission of MVRNA Authorisation
      • 3.2 Termination of MVRNA Authorisation
      • 3.3 Metered Volume Reallocation Notifications
      • 3.4 Not Used
      • 3.5 Refusal and rejection for credit reasons
      • 3.6 Metered Volume Reallocation Data
    • 4. AGGREGATION
      • 4.1 Aggregation of Energy Contract Volumes
      • 4.2 Exclusion of certain Metered Volume Reallocations
      • 4.3 Aggregation of Metered Volume Reallocations
      • 4.4 Determination and submission of aggregated data
    • 4A NULLIFICATION OF VOLUME NOTIFICATIONS
      • 4A.1 Submission of a Volume Notification Nullification Request
      • 4A.2 Validity of a VNNR
      • 4A.3 Amendment of a VNNR
      • 4A.4 ECVAA confirmation
      • 4A.5 Notification of completion of process
    • 5. FAILURES OF THE ECVAA SYSTEM
      • 5.1 Introduction
      • 5.2 Consequences of ECVAA System Failure
      • 5.3 ECVAA System Withdrawal
    • AMENDMENT RECORD – SECTION P

BSC Section P: Energy Contract Volumes and Metered Volume Reallocations V23.0

Effective From Date:07/11/2024
Status:LIVE
Other versions
Download