CONTENTS

  • SECTION F: MODIFICATION PROCEDURES
    • 1. MODIFICATION OF THE CODE
      • 1.1 Modification
      • 1.2 Role of the Panel, BSCCo and the Modification Secretary
      • 1.3 Modification Register
      • 1.4 Monthly Progress Report
      • 1.5 Standing Lists
      • 1.6 Change Co-ordination
      • 1.6A Changes that impact multiple Energy Codes
      • 1.7 Role of the NETSO
      • 1.8 Transitional Arrangements
      • 1.9 Interpretation
    • 2. CODE MODIFICATION PROCEDURES
      • 2.1 Modification Proposals
      • 2.1A Modification Proposals Submitted by Third Party Proposers
      • 2.2 Panel Proceedings
      • 2.3 Amalgamation
      • 2.4 Establishment of Workgroups
      • 2.5 Definition Procedure
      • 2.6 Assessment Procedure
      • 2.7 Report Phase
      • 2.7A Send Back Process
      • 2.7B Amendments Required by the Authority (EBGL)
      • 2.8 Analysis of the NETSO
      • 2.9 Urgent Code Modifications
      • 2.10 Confidentiality
      • 2.11 Implementation
      • 2.12 Intentionally left blank
    • 3. CREATION AND MODIFICATION OF CODE SUBSIDIARY DOCUMENTS
      • 3.1 Scope
      • 3.2 Procedures
    • 4. IS POLICIES
      • 4.1 Establishment
      • 4.2 Changes to BSC Systems
    • 5. SIGNIFICANT CODE REVIEW
      • 5.1 Significant Code Review Phase
      • 5.2 Modifications raised during a Significant Code Review Phase
      • 5.3 Significant Code Review Modifications
      • 5.3A Authority Led SCR Modification
      • 5.3B Backstop Direction
      • 5.4 Modifications raised prior to a Significant Code Review
    • 6. SELF-GOVERNANCE
      • 6.1 Determination of Self-Governance
      • 6.2 Withdrawal of a Self-Governance Statement
      • 6.3 Implementation of a Self-Governance Modification Proposal
      • 6.4 Appeal relating to the Panel’s determination of a Self-Governance Modification Proposal
    • 7. FAST TRACK SELF-GOVERNANCE
      • 7.1 Determination of Fast Track Self-Governance
      • 7.1.2 For the avoidance of doubt, the Panel shall not determine a Prioritisation Category for Fast Track Self-Governance Modification Proposals and accordingly no Fast Track Self-Governance Modification Proposal shall have a Prioritisation Category.7.2 Implementation of Fast Track Self-Governance Modification Proposals
      • 7.3 Objections to Fast Track Self-Governance Modification Proposals
    • 8. AUTHORITY RAISED OR DIRECTED MODIFICATION PROPOSALS
      • 8.1 Authority Raised Modification Proposals
      • 8.2 Authority Directed Modification Proposals
      • 8.3 Acceptance of Authority Raised or Directed Modification Proposals
      • 8.4 Withdrawal of Authority Raised or Directed Modification Proposals
      • 8.5 Amalgamation of Authority Raised or Directed Modification Proposals
      • 8.6 Non-Fettering of Voting Rights
    • ANNEX F-1:
      • CONTENTS OF REPORTS
    • ANNEX F-2: EBGL ARTICLE 18 TERMS AND CONDITIONS
    • AMENDMENT RECORD – SECTION F

BSC Section F: Modification Procedures V43.0

Effective From Date:28/05/2026
Status:LIVE
Other versions
Download