CONTENTS

  • 1 Introduction
    • 1.1 Scope and Purpose of the Procedure
      • 1.1.1 UMS Connection Agreements and National Terms of Connection
      • 1.1.2 Existing Exit Points
      • 1.1.3 BSC Procedure
    • 1.2 Main Users of Procedure and their Responsibilities
    • 1.3 Use of the Procedure
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 Acronyms and Definitions
      • 1.6.1 Acronyms
      • 1.6.2 Definitions
  • 2 Responsibilities of the LDSO and the UMSO
    • 2.1 LDSO activity:
    • 2.2 Responsibilities of the UMSO
      • 2.2.1 The UMSO is responsible for the following:
      • 2.2.2 Inventory of Unmetered Apparatus
      • 2.2.3 Allocation of MSIDs
      • 2.2.4 UMS Certificate
      • 2.2.5 Trading
      • 2.2.6 Termination of Appointment of UMSO
    • 2.3 General UMSO Service Requirements
      • 2.3.1 Process data in a timely manner
      • 2.3.2 Qualification for DIP access
      • 2.3.3 Reporting requirements
      • 2.3.4 Ability to use existing DTC flows
      • 2.3.5 Validate data
      • 2.3.6 Electricity Enquiry Service
      • 2.3.7 Manage data on receipt of interfaces
      • 2.3.8 Receive proposed appointment service request
      • 2.3.9 Validate and respond to proposed appointment service request
      • 2.3.10 Existing appointment amendment
      • 2.3.11 Receive de-appointment notification
      • 2.3.12 Receive Registration notification of UMSO accepted/rejected appointments
      • 2.3.13 Receive prospective appointment notification
      • 2.3.14 Receive the UMSO appointment notification
      • 2.3.15 Receive a lapsed appointment notification
      • 2.3.16 Receive prospective Data Service appointment notification
      • 2.3.17 Receive Data Service appointment notification
      • 2.3.18 Receive de-appointment with reason of disconnection
      • 2.3.19 Receive change of energisation request
      • 2.3.20 Receive change of energisation outcome
      • 2.3.21 Notify unable to action change in energisation status
      • 2.3.22 Update registration service with change in energisation status
      • 2.3.23 Validate updates and manage rejections
      • 2.3.24 Receive Meter Point Location (MPL) address/GSP Group ID update notification
      • 2.3.25 Receive Energy Direction update notification
      • 2.3.26 Receive Metered Status update notification
    • 2.4 Systems and Processes
    • 2.5 Service Availability
  • 3 Interface and Timetable Information
    • 3.1 Establishment of a New MSID
    • 3.2 Prospective Appointment of the UMSO
    • 3.3 Confirmed Appointment of the UMSO
    • 3.5 Termination of Appointment
    • 3.6 Provision of an UMS Inventory
    • 3.7 Change of Energisation Status of an MSID
    • 3.8 Disconnection of an MSID
    • 3.9 UMSO accesses Industry Standing Data
    • 3.10 Equivalent Meter Fault Reporting - UMSO Notification
    • 3.11 Central Management System - Fault Reporting to the UMSO
    • 3.12 Change of Connection type or Change of Segment
  • 4 Appendices
    • 4.1 Unmetered Charge Codes
    • 4.2 Switch Regimes
    • 4.3 PECU Arrays
      • 4.3.1 PECU Array Siting Procedure
    • 4.4 UMSO Validation of the Detailed UMS Inventory
      • 4.4.1 UMSO Validation
    • 4.5 Creation of D0388 - UMS Inventory
    • 4.6 Festive Lighting
    • 4.7 Processing of the D0389 by the UMSO
      • 4.7.1 UMSDS Response Reason Codes on the D0389
    • 4.8 Energised MSIDs with no Inventory
    • 4.9 De-energised MSIDs
  • AMENDMENT RECORD– BSCP704

BSCP704: Unmetered Supplies Operations for MHHS Metering Systems V2.0

Effective From Date:06/11/2025
Status:LIVE
Other versions
Download