HomeRulebook HomeBalancing and Settlement CodeBSC ProceduresBSCp702 Advanced Data Service
CONTENTS
- 1.1 Purpose and Scope of the Procedure
- 1.2 Main Users of Procedure and their Responsibilities
- 1.3 Use of the Procedure
- 1.4 Balancing and Settlement Code Provision
- 1.5 Associated BSC Procedures
- 1.6 Acronyms and Definitions
- 1.6.1 Acronyms
- 1.6.2 Definitions
- 2 Requirements and Responsibilities
- 2.1 General requirements
- 2.2 Requirements related to Appointments
- 2.3 Requirements for the transfer of UTC Period Level Data
- 2.4 Requirements for maintaining the Customer Direct Contract Advisory
- 2.5 Requirements for Collection of UTC Period Level Consumption
- 2.6 Requirements for Processing of UTC Period Consumption
- 2.7 Requirements for De-appointments and Registration Deactivation
- 2.8 Requirements for Change of Energisation Status
- 2.9 Requirements for Changes to Metering Equipment
- 2.10 Requirements for Changes to Registration (SMRS) Data
- 2.11 Requirements for Change of Connection Type or Change of Market Segment
- 2.12 Requirements for processing a Consumption Amendment
3 Interface and Timetable Information - 3.1 Industry Standing Data Activities
- 3.1.1 ADS accesses Industry Standing Data
- 3.2 Registration Activities
- 3.2.1 Change of Appointed ADS (with and without associated Change of Supplier)
- 3.2.2 New SVA Metering System with appointment of ADS
- 3.2.3 Notification to ADS following a Change of SVA MOA
- 3.2.4 De-appointment of ADS following Disconnection and Registration Deactivation of a SVA Metering System
- 3.3 Metering Activities
- 3.3.1 Notification of Change of Energisation Status for an SVA Metering System
- 3.3.2 Notification of Reconfigured or Replaced SVA Metering System
- 3.3.3 Notification following Change of Feeder Status – Energise Feeder
- 3.3.4 Notification following Change of Feeder Status – De-energise Feeder
- 3.4 Collection Activities
- 3.4.1 ADS collects, validates and sends consumption data for SVA Metering Systems
- 3.4.2 ADS investigates inconsistencies
- 3.4.3 Advanced Metering System investigation process
- 3.4.4 Consumption Amendment/Override Reads
- 3.5 Proving a Metering System
- 3.5.1 Proving of a Metering System by Method 1
- 3.5.2 Proving of a Metering System by Method 2
- 3.5.3 Proving of a Metering System by Method 3
- 3.5.4 Proving of a Metering System by Method 4
- 3.5.5 Issuing Results of Proving Test (All Methods of Proving)
- 3.5.6 Complex Site Validation Test
- 4. Appendix - Validation and Estimation Methods
- 4.2 Where UTC Period Consumption is consented for use in Settlement
- 4.2.1 Advanced Meters with UTC Period Consumption
- 4.2.2 General validation requirements
- 4.2.3 Outstation Id (Device Id)
- 4.2.4 Outstation Number of Channels
- 4.2.5 Outstation Time Check
- 4.2.6 Alarms
- 4.2.7A Cumulative/Total Consumption Comparison for Meters with integral Outstations which provide an electronic cumulative reading
- 4.2.7B Meter Advance Reconciliation Check
- A routine MAR is not required for de-energised Meters, on the basis that there is no advance to reconcile.
- 4.2.8 Main/Check Comparison
- 4.2.9 Storing validated data
- 4.2.10 Validating that UTC Period Consumption is not negative
- 4.2.11 ADS validates UTC Period Consumption against permissible maximum energy
- 4.2.11(a) Identifying missing or corrupted data
- 4.2.11(b) ADS treatment of a Site where Supply is de-energised
- 4.2.12 Estimating UTC Period Consumption
- 4.2.13 Amending consumption data following detection of theft from RPU service or other consumption adjustments
- 4.2.14 Estimating UTC Period Consumption where a Meter Advance is not available
- 4.2.15 Validation of estimated data
- 4.2.16 Receiving actual UTC Period data when data has previously been estimated
- 4.2.17 Receiving new data when data has previously been estimated
- 4.2.18 Estimation for export Metering Systems
- 4.2.19 Estimation Methods for import MSIDs where actual UTC Period Consumption is unavailable
- 4.2.20 Use of data where Main Meter data available but check Meter data missing.
- 4.2.21 Estimation where one UTC Period missing or incorrect where a Total Cumulative Meter register reading can be taken
- 4.2.22 Estimation where two or three UTC Periods missing or incorrect for Total Cumulative Meter register or one UTC Period missing or incorrect where a Total Cumulative Meter register reading cannot be taken
- 4.2.23 Estimation where Meter advance available using data from Interrogation Unit
- 4.2.24 Estimation where Meter advance available using actual data from previous or following month
- 4.2.25 Estimation where Meter advance available using actual data from previous or following 2-3 weeks
- 4.2.26 Estimation where Meter advance available using actual data from previous or following week
- 4.2.27 Estimation where Meter advance available using actual data from an alternative 4 week period
- 4.2.28 Estimation where Meter advance available using operational data or additional information
- 4.2.29 Estimation where Meter advance unavailable using actual data from previous or following month
- 4.2.30 Estimation where Meter advance unavailable using actual data from previous or following 2-3 weeks
- 4.2.31 Estimation where Meter advance unavailable using actual data from previous or following week
- 4.2.32 Estimation where Meter advance unavailable using actual data from an alternative 4 week period
- 4.2.33 Estimation where Meter advance unavailable using operational data or additional information
- 4.2.34 Estimation where No Meter advance, historical data, operational data or additional information available
- 4.2.35 Estimation where no Annual Consumption or Supplier Nominated Annual Consumption available
- 4.2.36 Standard Estimation Methods for Export Metering Systems
- 4.2.37 Export Measurement Quantity with missing values where netting occurs at site.
- 4.2.38 Estimation where Main Meter data available but check Meter data missing
- 4.2.39 Estimation where Main Meter data missing and check Meter installed. Data copied from the check Meter providing that data has passed validation
- 4.2.40 Estimation where one UTC Period missing or incorrect where Total Cumulative Meter register reading can be taken
- 4.2.41 Estimation where Main and check Meter data missing or incorrect
- 4.2.42 Estimation where Meter advance available - Operational or additional information used to construct the profile supplied from another source
- 4.2.43 Estimation where Meter advance unavailable - Operational or additional information used to construct the profile supplied from another source
- 4.2.44 Standard Estimation Methods for Reactive Power
- 4.2.45 Advanced Load Shape Categories
- 4.3 Where UTC Period Consumption is not consented for use in Settlement
- 4.3.1 Identifying Load Shape Categories using SMRS data
- 4.3.2 Load Shape Data Items
- 4.3.3 Load Shape Totals definition using ISD for Advanced Metering Systems
- 4.3.4 Meter Advances, Actual Daily Advances and Daily Advance Estimates
- 4.3.5 Validation of DA Values
- 4.3.6 Daily Advance Estimate Calculations
- 4.3.7 Readings Used for Calculating Meter Advances
- 4.3.8 Estimation where access to UTC Period Consumption is not consented
- 4.3.9 Identifiers used in this Appendix
- 4.3.10 Estimation of Readings on Change of Supplier
- 4.3.11 Estimation of ‘back-stop’ Readings
- 4.3.12 Estimation Reason Codes
- 4.3.13 Site Checks of Advanced Metering System - Site Visit Report
- 4.4 Reasons for Requesting a Metering System Investigation
- 4.5 Key SVA Meter Technical Details
- 4.6 Proving of Advanced Metering Systems
- 4.6.1 Reasons for a Proving Test
- 4.6.2 Methods of Proving
- 4.6.3 Comparison of Data
- 4.6.4 Reporting
- 4.6.5 Proving Test / Re-Test Timescales.
- 4.6.6 Failed Proving Test
- 4.6.7 Non-Completion of Proving Test
- 4.6.8 Proving Test Exemptions
- 4.7 Inbound Data Comparison Check
- 4.8 Guide to Complex Sites
- 4.8.1 Off-Site Totalisation
- 4.8.2 On-Site Totalisation.
- 4.8.3 Customers on a Licence Exempt Distribution (Private) Networks requiring Third Party Access for a Supplier of their choice
- 4.8.4 Feed-Through Sites at the Same Voltage with no Embedded Generation.
- 4.8.5 Feed Through Sites at Different Voltages
- 4.8.6 Feed-Through Sites with Embedded Generation
- 4.8.7 Separate Meter Points for Export and Import
- 4.8.8 Network Flows Impacting Settlement Meters
- 4.9 Service Levels
- 4.1 Data Estimation for Advanced Metering Systems
- AMENDMENT RECORD – BSCP702
BSCP702: Advanced Data Service V2.0
Effective From Date:06/11/2025
Status:LIVE
Other versions
Download