CONTENTS

  • 1 Introduction
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Main Users of Procedure and their Responsibilities
    • 1.3 Use of the Procedure
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 Acronyms and Definitions
      • 1.6.1 Acronyms
      • 1.6.2 Definitions
  • 2 Requirements and Responsibilities
    • 2.1 General Requirements
    • 2.2 Requirements related to Appointments
    • 2.3 Requirements for maintaining the Customer Direct Contract indicator
    • 2.4 Requirements for the Collection of UTC Period Level Consumption
    • 2.5 Requirements for the Processing of UTC Period Level Consumption
    • 2.6 Requirements for De-appointments and Registration Deactivation
    • 2.7 Requirements for Changes to SMRS Registration Data
    • 2.8 Requirements for Changes to Metering Equipment
    • 2.9 Requirements for Changes to Energisation Status
    • 2.10 Requirements for Change of Connection Type or Change of Market Segment
    • 2.11 Requirements for Off-Peak Declarations
    • 2.12 Requirements for processing a Consumption Amendment
  • 3 Interface and Timetable Information
    • 3.1 SDS accesses Industry Standing Data
    • 3.2 Registration Activities
    • 3.3 Collection of UTC Period Level Consumption for a DCC enrolled Smart Meter
    • 3.5 Processing of UTC Period Level Consumption and submission to BSC Central Systems
    • 3.6 Consumption Amendment/Override Reads
    • 3.7 Change of Energisation Status/Change of Meter
    • 3.8 Transfer of Reads – Smart Meters
    • 3.9 Transfer of Reads – Traditional Meters
    • 3.10 SDS investigates inconsistencies
    • 3.11 Smart Segment Metering System investigation process
  • 4. Appendices
    • 4.1 Smart Data Service Validation and Estimation
    • 4.2. General Validation Requirements for Register Readings
    • 4.3. Validation of smart Meter data
    • 4.4 Load Shapes
    • 4.5. Period Meter Advances, Actual Daily Advances, Actual Daily Consumption and Daily Advance Estimates
    • 4.6 Traditional Meter Advances for single and Multi-Rate Metering Systems
    • 4.7. SDS Estimation: General
    • 4.8. SDS Estimation Methods
    • 4.9. Site Checks of SVA Metering System - Site Visit Report

BSCP701:New MHHS provisions for the Smart Data Service Market Role V3.0

Effective From Date:25/06/2026
Status:LIVE
Other versions
Download