CONTENTS

  • 1 Introduction
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Main Users of Procedure and their Responsibilities
    • 1.3 Use of the Procedure
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 Acronyms and Definitions
    • 1.7 Meter Operator Agent Obligations
  • 2 Interface and Timetable Information
    • 2.2 Metering Activities
      • 2.2.1 Energise an Asset Metering System
      • 2.2.2 De-energise an Asset Metering System
      • 2.2.3 Removal of an Asset Metering System
      • 2.2.4 Reconfigure or Replace an Asset Metering System
      • 2.2.5 Change of Asset Feeder Status – Energise Feeder for an Asset
      • 2.2.6 Change of Asset Feeder Status – De-Energise Feeder for an Asset
    • 2.3 Collection Activities
      • 2.3.1 HHDC collects, validates and sends consumption data for an Asset Metering System where Half Hourly data is not sourced by the AMHHDC
      • 2.3.2 HHDC receives Half Hourly data from the AMHHDC, processes and sends consumption data for an Asset Metering System
      • 2.3.3 HHDC or AMHHDC investigates inconsistencies
    • 2.4 Meter Operation Activities for Asset Metering Systems
      • 2.4.1 Asset Metering System Investigation Process
    • 2.5 Proving an Asset Metering System
      • 2.5.1 Basic Proving Test
  • 2.1.1 Installation of a New Asset Metering System
  • 2.1.2 Commissioning of a New Asset Metering System
  • 2.1.3 Using an Existing Metering System as an Asset Metering System
  • 2.1.4 Change of AMVLP or Supplier for an Existing Metering System (No Change of Agent)
  • 2.1.5 Change of SVA MOA or AMMOA (No Change of Metering System or Change of AMVLP or Supplier)
  • 2.1.6 Concurrent Change of AMVLP or Supplier and SVA MOA or AMMOA (No change to Asset Metering System)
  • 2.1.7 Change of HHDC for an existing Asset Metering System (No change of AMHHDC)
  • 2.1.8 Change of AMHHDC for an existing Asset Metering System (No change of HHDC)
  • 2.1.9 Concurrent Change of HHDC and AMHHDC for an existing Asset Metering System
  • 2.1.10 Concurrent Change of AMVLP or Supplier and HHDC for an existing Asset Metering System (No change of AMHHDC)
  • 2.1.11 Concurrent Change of AMVLP or Supplier and AMHHDC for an existing Asset Metering System (No change of HHDC)
  • 2.1.12 Concurrent Change of AMVLP or Supplier, HHDC and AMHHDC for an existing Asset Metering System
  • 2.1.13 Change from AMHHDC to HHDC for an existing Asset Metering System
  • 3 APPENDICES
  • AMENDMENT RECORD - BSCP603

BSCP603: Meter Operations and Data Collection for Asset Metering Systems V4.0

Effective From Date:27/11/2025
Status:LIVE
Other versions
Download