CONTENTS

  • 1. Introduction
    • 1.1 Scope and Purpose of the Procedure
    • 1.2 Main Users of Procedure and their Responsibilities
    • 1.3 SMRS Access Restrictions, Controls and Constraints
    • 1.4 Audit Trail and Auditor Access
    • 1.5 Qualification
    • 1.6 Service Availability and Service Levels
    • 1.7 Use of the Procedure
    • 1.8 Balancing and Settlement Code Provision
    • 1.9 Associated BSC Procedures
    • 1.10 Associated Party Service Lines
    • 1.11 Acronyms and Definitions
  • 2. Not Used
  • 3. Interface and Timetable Information
    • 3.1 SVAA sends Market Domain Data
    • 3.2 Update of SMRS Database by Licensed Distribution System Operator
      • 3.2A Not Used
      • 3.2B Not Used
    • 3.3 Update of SMRS Database by Supplier6
    • 3.4 Change of Supplier for Half Hourly SVA Metering System
    • 3.5 Change of Data Aggregator for SVA Metering System16 17
    • 3.6 New Connection for SVA Metering System19
    • 3.7 Change of Supplier for Non-Half Hourly SVA Metering System
    • 3.8 Request for SMRS Information
    • 3.9 Removal of a SVA Metering System
    • 3.10 New Connection for Metering System which is associated with Exemptable Generating Plant and where the Export Meter(s) is Registered in CMRS34
    • 3.11 Instruction Processing
  • 4. Appendices
    • 4.1 This page has intentionally been left blank
    • 4.2 Erroneous Registrations
      • 4.2.1 General principle
      • 4.2.2 Scope
      • 4.2.3 Identification of Registration Error
      • 4.2.4 Rectification of Registration Error
      • 4.2.5 Registration Error detected within objection period
      • 4.2.6 Registration Error detected after objection period
    • 4.3 Data Validation
    • 4.4 Contact Notice Facility
    • 4.5 Refreshes
    • 4.6 Resends
    • 4.7 Service Level Performance Standards

BSCP501: Supplier Meter Registration Service V18.0

Effective From Date:01/09/2021
Status:SUPERSEDED
Other versions
Download