HomeRulebook HomeBalancing and Settlement CodeBSC ProceduresBSCp 75 Registration of Meter Aggregation Rule...
CONTENTS
- 1 Introduction
- 1.1 Purpose and Scope of the Procedure
- 1.2 Main Users of the Procedure and their Responsibilities
- 1.3 Key Milestones
- 1.4 Balancing and Settlement Code Provision
- 1.5 Associated BSC Procedures
- 1.6 Other
- 2 Acronyms and Definitions
- 2.1 List of Acronyms
- 2.2 List of Definitions
- 3 Interface and Timetable Information
- 3.1 Registration of Aggregation Rules
- 3.2 Notification of Operational Switching1
- 4 Appendices
- 4.1 Typical Configurations and Aggregation Rules for Volume Allocation Units
- 4.1.1 Overview
- 4.1.2 Primary BM Units
- 4.1.3 Simplified Power Station
- 4.1.4 Power Station with Switchable Auxiliary Generating Unit
- 4.1.5 Combined Cycle Power Station
- 4.1.6 Grid Supply Points and GSP Group Takes
- 4.1.7 Shared Grid Supply Point
- 4.1.8 Typical GSP including DSCP and GSP Group Take
- 4.1.9 Distribution System with all its Boundary Points registered in SMRS, entirely embedded within another Distribution System
- 4.1.10 Distribution System entirely embedded within an existing Distribution System with one embedded Primary BM Unit registered in CVA and all other entry/exit points registered in SVA
- 4.1.11 Complex Case: Distribution System with two GSP connections to the Transmission System and a DSCP to another Distribution System Operator in a second GSP Group
- 4.1.12 Interconnectors
- 4.2 BSCP75/4.2 Registration of Meter Aggregation Rules For Volume Allocation Units
- 4.3 Examples of Registration Form (Section 2 of Form BSCP75/4.2)
- 4.4 BSCP75/4.4 Election of Pre-Registered Aggregation Rule for Switching Group
- AMENDMENT RECORD – BSCP75
BSCP 75: Registration of Meter Aggregation Rules For Volume Allocation Units V16.0
Effective From Date:01/10/2024
Status:LIVE
Other versions
Download Forms
Download