CONTENTS

  • 1 Introduction
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Main Users of the Procedure and their Responsibilities
    • 1.3 Key Milestones
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 Other
  • 2 Acronyms and Definitions
    • 2.1 List of Acronyms
    • 2.2 List of Definitions
  • 3 Interface and Timetable Information
    • 3.1 Registration of Aggregation Rules
    • 3.2 Notification of Operational Switching1
  • 4 Appendices
    • 4.1 Typical Configurations and Aggregation Rules for Volume Allocation Units
      • 4.1.1 Overview
      • 4.1.2 Primary BM Units
      • 4.1.3 Simplified Power Station
      • 4.1.4 Power Station with Switchable Auxiliary Generating Unit
      • 4.1.5 Combined Cycle Power Station
      • 4.1.6 Grid Supply Points and GSP Group Takes
      • 4.1.7 Shared Grid Supply Point
      • 4.1.8 Typical GSP including DSCP and GSP Group Take
      • 4.1.9 Distribution System with all its Boundary Points registered in SMRS, entirely embedded within another Distribution System
      • 4.1.10 Distribution System entirely embedded within an existing Distribution System with one embedded Primary BM Unit registered in CVA and all other entry/exit points registered in SVA
      • 4.1.11 Complex Case: Distribution System with two GSP connections to the Transmission System and a DSCP to another Distribution System Operator in a second GSP Group
      • 4.1.12 Interconnectors
    • 4.2 BSCP75/4.2 Registration of Meter Aggregation Rules For Volume Allocation Units
    • 4.3 Examples of Registration Form (Section 2 of Form BSCP75/4.2)
    • 4.4 BSCP75/4.4 Election of Pre-Registered Aggregation Rule for Switching Group
    • AMENDMENT RECORD – BSCP75

BSCP 75: Registration of Meter Aggregation Rules For Volume Allocation Units V16.0

Effective From Date:01/10/2024
Status:LIVE
Other versions
Download Forms
Download