Home
Rulebook Home
Balancing and Settlement Code
BSC Procedures
BSCp 25 Registration of Transmission System Bo...
Previous version
Next version
CONTENTS
1 Introduction
1.1 Purpose and Scope of the Procedure
1.2 Main Users of the Procedure and their Responsibilities
1.3 Key Milestones
1.4 Balancing and
Settlement
Code
Provision
1.5 Associated Balancing and
Settlement
Code
Procedures
1.6 Authorisations
2. Acronyms and Definitions
2.1 List of Acronyms
2.2 List of Definitions
3. Not Used
4. Interface and Timetable Information
4.1 Transmission
System
Boundary Point Registration
4.2
Distribution
System
s Connection Point
Registration
4.3
Grid Supply Point
Registration
4.4
GSP Group
Registration
4.5 Registration of a new circuit associated with an existing DSCP or GSP
4.6 Transmission
System
s
Boundary Point
De-registration
4.7
Distribution
System
s Connection Point
De-registration
4.8
Grid Supply Point
De-registration
4.9 De-registration of one circuit at a DSCP or GSP
5. Appendices
BSCP25/5.1
Registration/De-registration of a Transmission
System
Boundary Point
BSCP25/5.2 Registration of a
Distribution
System
s Connection Point
BSCP25/5.3 Registration of a
Grid Supply Point
BSCP25/5.4 Registration of a
GSP Group
BSCP25/5.5 De-registration of a
Distribution
System
Connection Point
13
BSCP25/5.6 De-registration of a
Grid Supply Point
13
AMENDMENT RECORD – BSCP25
BSCP 25: Registration of Transmission System Boundary Points,Grid Supply Points, GSP Groups and Distribution Systems Connection Points V11.0
Effective From Date:
01/10/2024
Status:
LIVE
Other versions
Download Forms
Download
Defined Terms
Cross-references