  • 1 Introduction
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Main Users of the Procedure and their Responsibilities
    • 1.3 Key Milestones
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated Balancing and Settlement Code Procedures
    • 1.6 Authorisations
  • 2. Acronyms and Definitions
    • 2.1 List of Acronyms
    • 2.2 List of Definitions
  • 3. Not Used
  • 4. Interface and Timetable Information
    • 4.1 Transmission System Boundary Point Registration
    • 4.2 Distribution Systems Connection Point Registration
    • 4.3 Grid Supply Point Registration
    • 4.4 GSP Group Registration
    • 4.5 Registration of a new circuit associated with an existing DSCP or GSP
    • 4.6 Transmission Systems Boundary Point De-registration
    • 4.7 Distribution Systems Connection Point De-registration
    • 4.8 Grid Supply Point De-registration
    • 4.9 De-registration of one circuit at a DSCP or GSP
  • 5. Appendices
    • BSCP25/5.1 Registration/De-registration of a Transmission System Boundary Point
    • BSCP25/5.2 Registration of a Distribution Systems Connection Point
    • BSCP25/5.3 Registration of a Grid Supply Point
    • BSCP25/5.4 Registration of a GSP Group
    • BSCP25/5.5 De-registration of a Distribution System Connection Point13
    • BSCP25/5.6 De-registration of a Grid Supply Point13
    • AMENDMENT RECORD – BSCP25

BSCP 25: Registration of Transmission System Boundary Points,Grid Supply Points, GSP Groups and Distribution Systems Connection Points V11.0

Effective From Date:01/10/2024
Status:LIVE
Other versions