CONTENTS

  • 1. INTRODUCTION
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Main Users of the Procedure and their Responsibilities
    • 1.3 Balancing and Settlement Code Provision
    • 1.4 Associated BSC Procedures
    • 1.5 MOA Obligations
      • 1.5.1 General Obligations
      • 1.5.2 Registration Obligations
      • 1.5.3 Metering Obligations
      • 1.5.4 Interface to Other Agents
      • 1.5.5 Service Levels
      • 1.5.6 Input, Processing and Output
    • 1.6 CDCA Obligation
    • 1.7 Operational Emergencies
    • 1.8 Routine Work and Metering Faults
    • 1.9 Register of Sealing Pliers
    • 1.10 Register of Seals Applied
    • 1.11 Central Register of CVA MOA and the CDCA Sealing IDs
  • 2. Acronyms and Definitions
    • 2.1 List of Acronyms
    • 2.2 List of Definitions
  • 3. Interface and Timetable Information
    • 3.1 Routine Work and Metering Faults
    • 3.2 New Metering Equipment Sealing
    • 3.3 Removing Seals From De-Registered Metering Equipment
    • 3.4 Fault Investigation and Resolution
  • 4. Appendices
    • 4.1 BSCP06/4.1 This form is no longer used
    • 4.2 BSCP06/4.2 This form is no longer used
    • BSCP06/4.3 Register of Seals Applied
    • 4.4 BSCP06/4.4 This form is no longer used
    • 4.5 BSCP06/4.5 Metering Equipment Fault Report
    • 4.6 BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet
    • 4.7 Equipment to be Sealed, Types of Seals and Responsibilities for Sealing4
      • 4.7.1 Equipment to be Sealed
      • 4.7.2 Types of Seal and Purpose
      • 4.7.3 Guidance on Sealing Practice
      • 4.7.4 Control of Specified Seals and Associated Dies
    • 4.8 Meter Operator Agent Service Levels
      • 4.8.1 Meter Operator Service Levels – BSCP06
    • BSCP06/4.9 Risk Assessment of Metering Equipment Fault at Offshore Power Park Module

BSCP 06 CVA Meter Operations for Metering Systems Registered in CMRS v11.0 V13.0

Effective From Date:29/03/2019
Status:SUPERSEDED
Other versions
Download Forms
Download