HomeRulebook HomeBalancing and Settlement CodeBSC ProceduresBSCp 06 Cva Meter Operations For Metering Syst...BSCp 06 Cva Meter Operations For Metering Syst... V 13 0
CONTENTS
- 1. INTRODUCTION
- 1.1 Purpose and Scope of the Procedure
- 1.2 Main Users of the Procedure and their Responsibilities
- 1.3 Balancing and Settlement Code Provision
- 1.4 Associated BSC Procedures
- 1.5 MOA Obligations
- 1.5.1 General Obligations
- 1.5.2 Registration Obligations
- 1.5.3 Metering Obligations
- 1.5.4 Interface to Other Agents
- 1.5.5 Service Levels
- 1.5.6 Input, Processing and Output
- 1.6 CDCA Obligation
- 1.7 Operational Emergencies
- 1.8 Routine Work and Metering Faults
- 1.9 Register of Sealing Pliers
- 1.10 Register of Seals Applied
- 1.11 Central Register of CVA MOA and the CDCA Sealing IDs
- 2. Acronyms and Definitions
- 2.1 List of Acronyms
- 2.2 List of Definitions
- 3. Interface and Timetable Information
- 3.1 Routine Work and Metering Faults
- 3.2 New Metering Equipment Sealing
- 3.3 Removing Seals From De-Registered Metering Equipment
- 3.4 Fault Investigation and Resolution
- 4. Appendices
- 4.1 BSCP06/4.1 This form is no longer used
- 4.2 BSCP06/4.2 This form is no longer used
- BSCP06/4.3 Register of Seals Applied
- 4.4 BSCP06/4.4 This form is no longer used
- 4.5 BSCP06/4.5 Metering Equipment Fault Report
- 4.6 BSCP06/4.6 Notification of Completed Work/Meter Reading Sheet
- 4.7 Equipment to be Sealed, Types of Seals and Responsibilities for Sealing4
- 4.7.1 Equipment to be Sealed
- 4.7.2 Types of Seal and Purpose
- 4.7.3 Guidance on Sealing Practice
- 4.7.4 Control of Specified Seals and Associated Dies
- 4.8 Meter Operator Agent Service Levels
- 4.8.1 Meter Operator Service Levels – BSCP06
- BSCP06/4.9 Risk Assessment of Metering Equipment Fault at Offshore Power Park Module
BSCP 06 CVA Meter Operations for Metering Systems Registered in CMRS v11.0 V13.0
Effective From Date:29/03/2019
Status:SUPERSEDED
Other versions
Download Forms
Download