CONTENTS

  • 1 Introduction
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Main Users of the Procedures and their Responsibilities
    • 1.3 Key Milestones
    • 1.4 Balancing and Settlement Code Provision
    • 1.5 Associated BSC Procedures
    • 1.6 Metered Data Validation and Metering Status Exception Reports
    • 1.7 Data Estimation Guidance
  • 2 Acronyms and Definitions
    • 2.1 List of Acronyms
    • 2.2 List of Definitions
  • 3 Interface and Timetable Information
    • 3.1 Data Estimation for SF Run
    • 3.2 Data Estimation post SF Run4
    • 3.3 Data Correction for BM Unit in a Switching Group
    • 3.4 Demand Control Events – Estimate of Demand Disconnection Volumes for Directly Connected and Embedded BM Units.
  • 4 Appendices
    • 4.1 BSCP03/4.1 Authorisation Form for Estimation and Data Substitution
    • 4.2 BSCP03/4.2 Data Estimation/Substitution Sheet
    • 4.3 BSCP03/4.3 Estimated Demand Disconnection Volume Form – Part 1.
    • 4.4 BSCP03/4.4 Demand Disconnection Volume Data Estimation/Substitution Sheet
    • 4.5 BSCP03/4.5 Estimated Demand Disconnection Volume Form – Part 2.
    • 4.6 BSCP03 Reason Codes.
    • 4.7 Estimation of BM Unit Demand Disconnection Volumes
      • Example
  • AMENDMENT RECORD – BSCP03

BSCP 03: Data Estimation and Substitution for Central Volume Allocation V19.0

Effective From Date:26/06/2025
Status:LIVE