HomeRulebook HomeBalancing and Settlement CodeBSC ProceduresBSCp 02 Proving Test Requirements For Central ...
CONTENTS
- 1. INTRODUCTION
- 1.1 Purpose and Scope of the Procedure
- 1.2 Objectives
- 1.3 Main Users of the Procedures and their Responsibilities
- 1.4 Risk Assessment
- 1.5 Key Milestones
- 1.6 Balancing and Settlement Code Provision
- 1.7 Associated BSC Procedures
- 2. ACRONYMS AND DEFINITIONS
- [MHHS]2.1 List of Acronyms
- 2.2 List of Definitions
- 3. INTERFACE AND TIMETABLE INFORMATION
- 3.1 Proving Test Requirements for New Installations
- 3.2 Proving Test Requirements for Extension to Existing Installation
- 3.3 Proving Test Requirements where a Metering System Registration is transferred from SMRS to CMRS
- 3.4 Proving Test Requirements where a Meter has been Replaced with a Different Meter
- 3.5 Proving Test Requirements where a Outstation has been Replaced by Same Type
- 3.6 Proving Test Requirements where a Outstation has been Replaced by Different Type
- 3.7 Proving Test Requirements where a Outstation has been Reprogrammed
- 3.8 Commissioning End to End Check
- 4 APPENDICES
- BSCP02/4.1 - Confirmation of Discussion / Testing Requirements with CDCA
- BSCP02/4.2a - Metering System COMMISSIONING Test Record
- BSCP02/4.2b
- BSCP02/4.3 - Metering System PROVING Test Record
- BSCP02/4.4 - Confirmation of Installation of Metering Equipment (Including Extension or Modification to Metering Systems)
- BSCP02/4.5 - Risk Assessment
- BSCP02/4.6 - Metering System Commissioning End to End Check Test Record
- 5. Table of Testing Requirements and Methods of Assurance of Settlement Data
- 5.1 New CVA Metering Systems / Additions to CVA Metering Systems
- 5.2 Work Affecting Existing Meters
- 5.3 Work Affecting Existing Outstations
- 5.4 Other Activities
- 5.5 Guidance Notes
BSCP 02: Proving Test Requirements for Central Volume Allocation Metering Systems V10.0
Effective From Date:22/09/2025
Status:LIVE