CONTENTS

  • 1. INTRODUCTION
    • 1.1 Purpose and Scope of the Procedure
    • 1.2 Objectives
    • 1.3 Main Users of the Procedures and their Responsibilities
    • 1.4 Risk Assessment
    • 1.5 Key Milestones
    • 1.6 Balancing and Settlement Code Provision
    • 1.7 Associated BSC Procedures
  • 2. ACRONYMS AND DEFINITIONS
    • [MHHS]2.1 List of Acronyms
    • 2.2 List of Definitions
  • 3. INTERFACE AND TIMETABLE INFORMATION
    • 3.1 Proving Test Requirements for New Installations
    • 3.2 Proving Test Requirements for Extension to Existing Installation
    • 3.3 Proving Test Requirements where a Metering System Registration is transferred from SMRS to CMRS
    • 3.4 Proving Test Requirements where a Meter has been Replaced with a Different Meter
    • 3.5 Proving Test Requirements where a Outstation has been Replaced by Same Type
    • 3.6 Proving Test Requirements where a Outstation has been Replaced by Different Type
    • 3.7 Proving Test Requirements where a Outstation has been Reprogrammed
    • 3.8 Commissioning End to End Check
  • 4 APPENDICES
    • BSCP02/4.1 - Confirmation of Discussion / Testing Requirements with CDCA
    • BSCP02/4.2a - Metering System COMMISSIONING Test Record
    • BSCP02/4.2b
    • BSCP02/4.3 - Metering System PROVING Test Record
    • BSCP02/4.4 - Confirmation of Installation of Metering Equipment (Including Extension or Modification to Metering Systems)
    • BSCP02/4.5 - Risk Assessment
    • BSCP02/4.6 - Metering System Commissioning End to End Check Test Record
  • 5. Table of Testing Requirements and Methods of Assurance of Settlement Data
    • 5.1 New CVA Metering Systems / Additions to CVA Metering Systems
    • 5.2 Work Affecting Existing Meters
    • 5.3 Work Affecting Existing Outstations
    • 5.4 Other Activities
    • 5.5 Guidance Notes

BSCP 02: Proving Test Requirements for Central Volume Allocation Metering Systems V10.0

Effective From Date:22/09/2025
Status:LIVE