Performance Assurance: SETTLEMENT RISK |
Guidance Note |
|
How Elexon and the Performance Assurance Board (PAB) identify and record Settlement Risks
Details of how Elexon and the PAB assess the likely impact of each Settlement Risk on the overall integrity of Settlement, which is set out each year in the Risk Evaluation Methodology (REM)
Details of Elexon and the PAB’s assessment of these impacts for a given Performance Assurance Operating Period (PAOP), which is set out each year in the Risk Evaluation Register (RER)
Details of how Elexon and the PAB mitigate these impacts, which is set out each year in the Risk Operating Plan (ROP) and in the Menu of Performance Assurance Techniques
Specific details of the Settlement processes, failure of which could cause a Risk to materialise, which are set out in the relevant section of the BSC and Code Subsidiary Documents (CSDs) such as the BSC Procedures (BSCPs)
Consumption or Generation data failing to enter Settlement, usually identified through Settlement Performance, expressed as the amount of actual metered data used to calculate Settlement Volumes; and/or
Incorrect consumption or Generation data entering Settlement, usually identified through Settlement Accuracy (the factor by which the overall volume of energy recorded in Supplier Volume Allocation (SVA) needs to be scaled up or down to match the overall volume of energy recorded in Central Volume Allocation (CVA)) exceeding certain tolerances.
Registration and Appointments
Data Retrieval and Processing
Metering Installation and Maintenance
Central Systems and BSC Agents
A Risk Event is any event (whether internal or external to the market) that impacts more than one Settlement Risk, such as an economic crisis or disease pandemic. Risk Events often impact the scope of some PATs and require the deployment of others.
Market Issues are common challenges experienced by all or many Market Participants in fulfilling their BSC obligations around particular Settlement processes. In addition to impacting the scope and deployment of PATs, a Market Issue will usually require Elexon to take a leadership role in delivering a strategic response outside of “business as usual” PAF activity.
REG-01 Metering Point Registration information is created, maintained or transferred incorrectly or not at all
REG-02 Volume Allocation Unit Registration information is created, maintained or transferred incorrectly or not at all
REG-03 Meter Technical Details are transferred incorrectly or at all
REG-04 Settlement Data required for the validation and estimation of energy volumes is created, maintained or transferred incorrectly or not at all
REG-05 Agents are not appointed or de-appointed correctly
MET-01 Metering Equipment is installed, programmed or maintained incorrectly including where Commissioning is performed incorrectly or not at all
MET-02 Meter Technical Details are created incorrectly
MET-03 Meter Technical Details are not maintained or transferred correctly or at all following changes to Metering Equipment
MET-04 A fault with Metering Equipment, including communications equipment, is not resolved
DAT-01 Metered data is not retrieved physically where remote data is not available
DAT-02 Energy volumes are not estimated correctly or at all where metered data is not available
DAT-03 Metered data is validated or submitted incorrectly or not at all
DAT-04 Manual adjustments to Metered Data are completed or recorded incorrectly or not at all
DAT-05 Revenue Protection processes are followed incorrectly or not at all
CEN-01 An item within MDD or ISD is created or updated incorrectly or not at all
CEN-02 The SVAA carries out its functions incorrectly or not at all
CEN-03 The CDCA carries out its functions incorrectly or not at all
CEN-04 NETSO submits Settlement data to the SAA incorrectly or not at all
CEN-05 The SAA carries out its functions incorrectly or not at all
CEN-06 The ECVAA carries out its functions incorrectly or not at all
CEN-07 The FAA carries out its functions incorrectly or not at all
Former Risk | Current Risk(s) |
SVA 01 SVA Metering Point is registered incorrectly or not at all, such that metered data is not collected or aggregated | REG-01 Metering Point Registration information is created, maintained or transferred incorrectly or not at all |
SVA 02 SVA Metering System attributes held in the Supplier Meter Registration Service (SMRS) or by any party in the Supplier Hub are incorrect | REG-01 Metering Point Registration information is created, maintained or transferred incorrectly or not at all |
SVA 03 SVA Metering Equipment is installed, programmed or maintained incorrectly including where Commissioning is performed incorrectly or not at all | MET-01 Metering Equipment is installed, programmed or maintained incorrectly including where Commissioning is performed incorrectly or not at all |
SVA 04 Changes to SVA Metering Equipment are not notified, such that all members of the Supplier Hub do not use the current Meter Technical Details | MET-03 Meter Technical Details are not maintained or transferred correctly or at all following changes to Metering Equipment |
SVA 05 A fault with SVA Metering Equipment is not resolved, such that metered data is recorded incorrectly or cannot be retrieved | MET-04 A fault with Metering Equipment, including communications equipment, is not resolved |
SVA 06 On a change of agent, Meter Technical Details are not transferred or processed correctly or at all, such that parties do not use the latest Meter Technical Details | REG-03 Meter Technical Details are transferred incorrectly or at all |
SVA 07 SVA Metered data is not retrieved, such that the proportion of estimated data being used in Settlement contributes to performance standards not being met | DAT-01 Metered data is not retrieved physically where remote data is not available |
SVA 08 SVA metered data is not processed or transferred correctly, or at all | DAT-02 Energy volumes are not estimated correctly or at all where metered data is not available |
DAT-03 Metered data is validated or submitted incorrectly or not at all | |
SVA 09 The Data Aggregator does not process metered data correctly or at all, including transfer to SVAA, such that the energy volumes required for Settlement are incorrect or missing | DAT-03 Metered data is validated or submitted incorrectly or not at all |
SVA 10 On change of Data Collector, meter read history is incorrect or not transferred such that sufficient history is not available for validating and estimating energy volumes | REG-04 Settlement Data required for the validation and estimation of energy volumes is created, maintained or transferred incorrectly or not at all |
SVA 11 Unmetered Supplies volumes are calculated incorrectly or not at all | REG-01 Metering Point Registration information is created, maintained or transferred incorrectly or not at all |
REG-04 Settlement Data required for the validation and estimation of energy volumes is created, maintained or transferred incorrectly or not at all | |
REG-05 Agents are not appointed or de-appointed correctly | |
DAT-02 Energy volumes are not estimated correctly or at all where metered data is not available | |
DAT-03 Metered data is validated or submitted incorrectly or not at all | |
DAT-04 Manual adjustments to Metered Data are completed or recorded incorrectly or not at all | |
SVA 12 SVA Metering System technical details are created incorrectly | MET-02 Meter Technical Details are created incorrectly |
SVA 13 Manual adjustments to Metered Data are not completed correctly, or at all | DAT-04 Manual adjustments to Metered Data are completed or recorded incorrectly or not at all |
SVA 14 Agents are not appointed or de-appointed correctly, such that SMRS is not complete or up to date, members of the Supplier Hub do not hold the correct MPID of other Hub members or the appropriate agents are not appointed | REG-05 Agents are not appointed or de-appointed correctly |
SVA 15 SVA reference data is not created or transferred correctly, or at all | CEN-01 An item within MDD or ISD is created or updated incorrectly or not at all |
SVA 16 The energisation status held in SMRS or by any party in the Supplier Hub does not match the physical energisation status of the SVA Metering System | REG-01 Metering Point Registration information is created, maintained or transferred incorrectly or not at all |
SVA 17 Exception reports are not sufficiently managed, such that material exceptions are not addressed at all or in a timely manner | REG-01 Metering Point Registration information is created, maintained or transferred incorrectly or not at all |
REG-05 Agents are not appointed or de-appointed correctly | |
DAT-03 Metered data is validated or submitted incorrectly or not at all | |
SVA 18 Revenue protection processes are not managed sufficiently, such that unrecorded energy volumes are excluded from Settlement | DAT-05 Revenue Protection processes are followed incorrectly or not at all |
SVA 25 Balancing Services provided by Virtual Lead Parties allow error to enter Settlement, such that the energy volumes required for Settlement are incorrect or missing | REG-02 Volume Allocation Unit Registration information is created, maintained or transferred incorrectly or not at all |
CVA 19 A Volume Allocation Unit is registered incorrectly or not at all, such that the CDCA does not collect any or the relevant data | REG-02 Volume Allocation Unit Registration information is created, maintained or transferred incorrectly or not at all |
CVA 20 CVA Metering Equipment is installed, programmed or maintained incorrectly including where Commissioning is performed incorrectly or not at all | MET-01 Metering Equipment is installed, programmed or maintained incorrectly including where Commissioning is performed incorrectly or not at all |
CVA 21 CVA Metered Data is not retrieved, or processed correctly, or at all, by the CDCA | DAT-01 Metered data is not retrieved physically where remote data is not available |
DAT-03 Metered data is validated or submitted incorrectly or not at all | |
CVA 22 Changes to CVA Metering Equipment are not notified to CDCA | MET-03 Meter Technical Details are not maintained or transferred correctly or at all following changes to Metering Equipment |
CVA 23 A fault with CVA Metering Equipment is not resolved, such that Metered Data is recorded incorrectly or cannot be retrieved | MET-04 A fault with Metering Equipment, including communications equipment, is not resolved |
CVA 24 CVA reference data is not created or transferred correctly, or at all | REG-03 Meter Technical Details are transferred incorrectly or at all |
REG-05 Agents are not appointed or de-appointed correctly | |
MET-02 Meter Technical Details are created incorrectly | |
DAT-03 Metered data is validated or submitted incorrectly or not at all | |
CEN-01 An item within MDD or ISD is created or updated incorrectly or not at all | |
CVA 26 Aggregation Rules in CDCA are incorrect such that CVA Metered Data is not correctly aggregated, and the energy volumes required for Settlement are incorrect or missing | CEN-03 The CDCA carries out its functions incorrectly or not at all |
CVA 27 Trading Parties do not or are unable to pay Trading Charges fully or at all, such that it triggers an Event of Default | This would not relate to a failure of a specific Settlement system or process and has been removed from the Ledger. Disorderly Market exits (such as Parties ceasing to trade) will now be recorded as Risk Events. |
CVA 28 NETSO does not submit or submits incorrect Settlement data | CEN-04 NETSO submits Settlement data to the SAA incorrectly or not at all |
CVA 29 The SAA's calculations and processing are incorrect or use incorrect data | CEN-05 The SAA carries out its functions incorrectly or not at all |
CVA 30 The ECVAA does not carry out processes correctly, such that output files are inaccurate | CEN-06 The ECVAA carries out its functions incorrectly or not at all |
CVA 31 The FAA does not accurately process Trading Charges or calculate ad-hoc charges correctly, such that Advice Notes are incorrect | CEN-07 The FAA carries out its functions incorrectly or not at all |
CVA 32 Manual adjustments to CVA Metered Data are not completed correctly, or at all | DAT-04 Manual adjustments to Metered Data are completed or recorded incorrectly or not at all |
CVA 33 An Interconnector Administrator does not submit, or submits inaccurate BM Unit Metered Volume data | DAT-03 Metered data is validated or submitted incorrectly or not at all |
CVA 34 The SVAA does not process or transfer the correct data or does not use approved default data. | CEN-02 The SVAA carries out its functions incorrectly or not at all |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |