Balancing and Settlement Code
BSC PROCEDURE
HALF HOURLY DATA COLLECTION FOR SVA METERING SYSTEMS REGISTERED IN SMRS
BSCP502
Date: |
Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in Elexon or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other non-commercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, Elexon Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. |
Version | Date | Description of Changes | Changes Included | Mods/ Panel/ Committee Refs |
2.0 | Code Effective Date | Approved for use by the Panel. |
|
|
3.0 | Code Effective Date | Version alignment changes from AP502 (NCR329) and changes for transfers between CMRS and SMRS embodied (NCR114). | NCR114, NCR329 |
|
4.0 | 04/03/02 | CP691 relating to HH proving and validation embodied. | CP691 | SVG/09/117 |
5.0 | 03/02/03 | SVA Documentation Batch Release; CP772 and CP838. | CPs 774, 762, 779, 801, 805, 810, 772, 838 | SVG/21/263, SVG/22/274, SVG/22/275 |
6.0 | 29/05/03 | SVA May Release. | CP873, CP899 | SVG/23/291, SVG/25/342 |
7.0 | 01/08/03 | Updated for Modification P62. | P62 | SVG/29/390 |
8.0 | 28/08/03 | August 03 SVA Document Batch Release. | CPs 854, 912 | SVG/29/389 SVG/30/397 |
9.0 | 04/11/03 | SVA November 03 Release | P107 | SVG/33/442 |
10.0 | 04/11/04 | SVA November 04 Release | CPs 955, 1025, 1032 | SVG/43/003 |
11.0 | 23/02/05 | SVA February 05 Release and BETTA 6.3 | CPs 982, 1034, 1042, 1044, 1045, 1048, 1091and BETTA 6.3 | SVG48/004 |
12.0 | 03/11/05 | SVA November 05 Release | CPs, 1068, 1072, 1095, 1139 and P176 | SVG56/004 |
13.0 | 29/06/06 | June 06 Release | CP1143, CP1144, CP1145, CP1147 | SVG64/02 |
14.0 | 28/06/07 | June 07 Release
Updated terminology in preparation for P197 Release | CP1172 (part)
CP1176 (part) CP1173 P197 | ISG66/06 SVG66/04 ISG68/02 SVG67/17 SVG70/03 |
15.0 | 01/11/07 | November 07 Release | CP1183 v2.0 and CP1200 | SVG74/03 |
16.0 | 28/02/08 | February 08 Release | CP1166 v.3.0 CP1213 CP1214 | SVG79/02 SVG81/01
|
17.0 | 26/06/08 | June 08 Release | CP1192 v2.0 | SVG81/01 |
18.0 | 26/02/08 | February 09 Release | CP1261 | ISG93/02 |
19.0 | 25/02/10 | February 10 Release | CP1299 | SVG102/01 |
|
|
| CP1302 | SVG103/02 |
|
|
| CP1303 | SVG103/02 |
20.0 | 04/11/10 | November 10 Release | CP1338 | SVG116/05 |
21.0 | 03/11/11 | November 11 Release | P253 | SVG127/13 |
22.0 | 29/11/12 | November 12 Release | CP1377 | SVG140/04 |
23.0 | 13/06/14 | 13 June 2014 | P299 | P224/06 |
24.0 | 25/06/15 | 25 June 2015 | CP1409 | SVG160/06 |
|
|
| CP1411 | SVG160/08 |
|
|
| CP1429 | SVG170/03 |
25.0 | 05/11/15 | 5 November 2015 | P300 | P228/06 |
|
|
| CP1431 | SVG171/02 |
|
|
| CP1432 | SVG171/03 |
|
|
| CP1440 | SVG173/05 |
|
|
| CP1439 | SVG174/04 |
|
|
| CP1444 | SVG176/05 |
|
|
| P305 | SVG176/03 |
26.0 | 30/06/16 | 30 June 2016 | CP1452 | SVG180/05 |
27.0 | 23/02/17 | 23 February 2017 | CP1472 | SVG191/05 ISG190/03 |
28.0 | 29/06/17 | 29 June 2017 | CP1469 | SVG188/03 |
|
|
| CP1474 | SVG191/03 |
29.0 | 29/03/19 | 29 March 2019 Standalone Release | P369 | P285/12 |
30.0 | 27/06/19 | 27 June 2019 Release | P367 Self-Governance | SVG219/02 |
31.0 | 12/10/20 | P397 Standalone Release | P397 | P298/05 |
32.0 | 25/02/21 | 25 February 2021 Release | CP1534 | SVG235/04 |
33.0 | 01/09/21 | 1 September Release | P420 | P316/05 |
34.0 | 04/11/21 | 4 November Standard Release | CP1541 | SVG243/02 |
35.0 | 30/06/22 | 30 June Standard Release | CP1532, CP1557 | SV6250/04, SVG250/05 |
36.0 | 18/07/22 | 18 July Non Standard Release | P436 | 325/05 |
37.0 | 03/11/22 | 3 November Standard Release | CP1559,CP1560 | SVG255/06, ISG253/05 and SVG255/04 |
38.0 | 17/11/22 | 17 November Special Release | P437 | P331/04 |
39.0 | 14/12/22 | 14 December Special Release | P434 | P332/04 |
40.0 | 29/06/23 | 29 June Standard Release | CP1580 | P338/04 |
BSCP01 | Overview of Trading Arrangements |
BSCP11 | Trading Disputes |
BSCP32 | Metering Dispensations |
BSCP68 | Transfer of Registration of Metering Systems between CMRS and SMRS |
BSCP503 | Half Hourly Data Aggregation for Metering Systems Registered in SMRS |
BSCP504 | Non-Half Hourly Data Collection for SVA Metering Systems Registered in SMRS |
BSCP508 | Supplier Volume Allocation Agent |
BSCP515 | Licensed Distribution |
BSCP520 | Unmetered Supplies Registered in SMRS |
BSCP537 | Qualification Process for SVA Parties, SVA Party Agents and CVA MOAs |
BSCP550 | Shared SVA Metering Arrangement of Half Hourly Import and Export Active Energy |
BSC | Balancing and Settlement Code |
BSCP | BSC Procedure |
CMRS | Central Meter Registration Service |
CoMC | Change of Measurement Class |
Complex Site | See Appendix 4.9 |
CoP | Code of Practice |
CoS | Change of Supplier |
CSS | Central Switching Service |
CT | Current Transformer |
DC | Data Collector |
DCC | Data Communications Company |
DCE | Demand Control Event |
DTN | Data Transfer Network |
EAC | Estimated Annual Consumption |
EM | Equivalent Meter |
EMDS | Energy Market Data Specification |
HH | Half Hourly |
HHDA | Half Hourly Data Aggregator |
HHDC | Half Hourly Data Collector |
HHU | Hand Held Unit |
Id | Identifier |
kvarh | kilovoltamperes reactive hour |
kWh | Kilowatt hour |
LDSO | Licensed Distribution System Operator |
LLF | Line Loss Factor |
MAR | Meter Advance Reconciliation |
MDD | Market Domain Data |
MDDM | Market Domain Data Manager |
MS | Metering System |
MSID | Metering System Identifier |
MTD | Meter Technical Details |
NETSO | National Electricity Transmission System Operator as the holder of the Transmission Licence and any reference to "NETSO", "NGESO", "National Grid Company" or "NGC" in the Code or any Subsidiary Document shall have the same meaning. |
NHH | Non Half Hourly |
NHHDC | Non Half Hourly Data Collector |
REC | Retail Energy Code |
Ref | Reference |
SFIC | Systems Fault Information Centre |
SMETS | Smart Metering Equipment Technical Specifications |
SMRS | Supplier Meter Registration System |
SSD | Supply Start Date |
SVAA | Supplier Volume Allocation Agent |
SVA MOA2 | SVA Meter Operator Agent |
UTC | Co-ordinated Universal Time |
VT | Voltage Transformer |
WD | Working Day |
Wh | Watt hour |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.1.1.1 | If required. | Request MDD. | HHDC. | MDDM. | HHDC Id. | Electronic or other method, as agreed |
3.1.1.2 | When published by SVAA or within 1 WD of request from HHDC. | Send MDD. | SVAA. | HHDC3. | D0269 Market Domain Data Complete Set. D0270 Market Domain Data Incremental Set. P0186 Half Hourly Default EAC. The HHDC shall record and use such MDD as is considered appropriate by the Panel (having regard to the HHDC’s functions) and shall, in particular, use only MDD for those items in relation to which there is a MDD entry4 | Electronic or other method, as agreed. Manual Process. |
3.1.1.3 | Within 4 working hours of receipt of MDD. | Send acknowledgement that data has been received. | HHDC. | MDDM. | P0024 Acknowledgement. | Electronic or other method, as agreed. |
3.1.1.4 | If file not readable & / or not complete. | Send notification & await receipt of MDD. | HHDC. | MDDM. | P0035 Invalid Data. | Electronic or other method, as agreed. |
3.1.1.5 | After receiving notification. | Send corrected MDD. Return to 3.1.1.2. | SVAA. | HHDC. | Refer to 3.1.1.2 for data flows. | Electronic or other method, as agreed. |
3.1.1.6 | As soon as possible after data in correct format. | Update records. | HHDC4 |
| The HHDC shall record and use such MDD as is considered appropriate by the Panel (having regard to the HHDC’s functions) and shall, in particular, use only MDD for those items in relation to which there is a MDD entry 5 | Internal Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.1.1 | On appointment of new HHDC. | Send notification of appointment details
| Supplier. | HHDC. | D01556 Notification of New Meter Operator or Data Collector Appointment and Terms.
| Electronic or other method, as agreed. |
3.2.1.2 | Within 2 WD of 3.2.1.1 | Send confirmation of appointment acceptance | HHDC. | Supplier. | D0011 Agreement of Contractual terms. | Electronic or other method, as agreed. |
3.2.1.3 | Within 1 WD of receiving all applicable D0011s | Send appointment details for MS, including start date and IDs of HHDA and SVA MOA. The sending of the D0302 is optional for Supplier-serviced Metering Systems. | Supplier. | HHDC. | D0148 Notification of Change to Other Parties. D0289 Notification of MC/EAC/PC 7. D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
3.2.1.4 | Upon receipt of SVA MS details. | Record SVA MS details. Validate SVA MS details received from the Supplier against MDD received from the SVAA. | HHDC. |
| Sufficient details of HHDC’s appointment in respect of a SVA MS to enable the HHDC to perform its HHDC functions. These details shall include the relevant SVA MSID and the Identifiers for the SVA MOA and, as the case may be, the HHDA, the LDSO and the applicable GSP Group. The details shall also include the Settlement Days for which the HHDC and HHDA are appointed. | Internal Process. |
For HHDC-serviced Metering Systems | ||||||
3.2.1.5 | Within 5 WD of the installation and commissioning of MS. | Send initial Meter register readings Send MTD and Energisation Status. | SVA MOA8. | Supplier / HHDC / LDSO HHDC | D0010 Meter Readings. D0268 Half Hourly Meter Technical Details. If site is complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.2.1.6 | Where appropriate, on agreement of reading schedule with Supplier.9 | Send Meter reading schedule. | HHDC. | Supplier, LDSO | D0012 Confirmation of the Inclusion of the Metering Point in the Reading Schedules. | Electronic or other method, as agreed. |
3.2.1.7 | Where appropriate, from HHDC appointment start date.9 | Collect HH Metered Data. | HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.2.1.8 | In accordance with timescales in Appendix 4.6. | Prove MS. | SVA MOA. | HHDC. | Refer to Appendix 4.6. | Electronic or other method, as agreed. |
For Supplier-serviced Metering Systems | ||||||
3.2.1.9 | From HHDC appointment start date. | Collect HH Metered Data. | Supplier. |
| Refer to Section 3.4. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.3.1 | .By SSD – 1 WD | Send notification of appointment | New Supplier. | HHDC. | D0155 Notification of New Meter Operator or Data Collector Appointment and Terms10.
| Electronic or other method, as agreed. |
3.2.3.2 | Within 2 WD of 3.2.3.1 | Send confirmation of appointment acceptance | HHDC. | New Supplier. | D0011 Agreement of Contractual terms. | Electronic or other method, as agreed. |
3.2.3.3 | Within 1 WD of receiving all applicable D0011s | Send appointment details of MS, including start date and IDs of HHDA and SVA MOA. | New Supplier. | HHDC. | D0148 Notification of Change to Other Parties D0289 Notification of MC/EAC/PC. | Electronic or other method, as agreed. |
3.2.3.4 | Upon receipt of SVA MS details. | Record SVA MS details. Validate SVA MS details received from the Supplier against MDD received from the SVAA. | HHDC. |
| Sufficient details of HHDC’s appointment in respect of a SVA MS to enable the HHDC to perform its HHDC functions. These details shall include the relevant SVA MSID and the Identifiers for the SVA MOA and, as the case may be, the HHDA, the LDSO and the applicable GSP Group. The details shall also include the Settlement Days for which the HHDC and HHDA are appointed. | Internal Process. |
3.2.3.5 | On agreement of reading schedule with new Supplier. | Send Meter reading schedule. | HHDC. | New Supplier, LDSO | D0012 Confirmation of the Inclusion of the Metering Point in the Reading Schedules. Sending of the D0012 is optional for Supplier-serviced Metering Systems. | Electronic or other method, as agreed. |
3.2.3.6 | From HHDC appointment start date for new Supplier. | Collect HH Metered Data for new Supplier including an initial Meter reading. | HHDC/New Supplier. |
| Refer to Section 3.4. | Internal Process. |
3.2.3.7 | . By New Supplier SSD | Send appointment termination date for MS. | Old Supplier. | HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
3.2.3.8 | For HHDC-serviced Metering Systems. Within 10 WD after end of HHDC appointment to old Supplier. | Complete HH Metered Data collection activities for the old Supplier. | HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.4.1 | On appointment of new HHDC. | Send notification of appointment. | Supplier. | New HHDC. | D0155 Notification of New Meter Operator or Data Collector Appointment and Terms.
| Electronic or other method, as agreed. |
3.2.4.2 | Within 2 WD of 3.2.4.1 | Record SVA MS details. Validate SVA MS details received from the Supplier against MDD received from the SVAA and send the D0011 to the Supplier.. | New HHDC. | Supplier | D0011 Agreement of Contractual terms. Sufficient details of HHDC’s appointment in respect of a SVA MS to enable the HHDC to perform its HHDC functions. These details shall include the relevant SVA MSID and the Identifiers for the SVA MOA and, as the case may be, the HHDA, the LDSO and the applicable GSP Group. The details shall also include the Settlement Days for which the HHDC and HHDA are appointed. | Electronic or other method, as agreed. |
3.2.4.3 | Within 1 WD of receiving all applicable D0011s | Send appointment details of MS, including start date and IDs of relevant HHDAs, SVA MOA and old HHDC. The sending of the D0302 is optional for Supplier-serviced Metering Systems. | Supplier. | New HHDC. | D0148 Notification of Change to Other Parties. D0289 Notification of MC/EAC/PC7. D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
3.2.4.4 | On appointment of new HHDC. | Send appointment termination date for MS. | Supplier. | Old HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
For HHDC-serviced Metering Systems. | ||||||
3.2.4.5 | Within 5 WD of notification of new HHDC. | Send MTD and details of any current faults. | SVA MOA. | New HHDC. | D0002 Fault Resolution Report or Request for Decision on Further Action. D0268 Half Hourly Meter Technical Details. If site is complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.2.4.6 | In accordance with timescales in Appendix 4.6. | Prove MS in accordance with the rules defined in Appendix 4.6. | SVA MOA. | New HHDC. | Refer to Appendix 4.6. | Electronic or other method, as agreed. |
3.2.4.7 | On agreement of reading schedule with Supplier. | Send Meter reading schedule. | New HHDC. | Supplier, LDSO. | D0012 Confirmation of the Inclusion of the Metering Point in the Reading Schedules. | Electronic or other method, as agreed. |
3.2.4.8 | From HHDC appointment start date. | Collect HH Metered Data, including an initial Meter reading. | New HHDC |
| Refer to Section 3.4.1. | Internal Process. |
3.2.4.9 | Before Final Reconciliation Volume Allocation Run11. | Request 14 months of historic HH Metered Data | New HHDC. | Old HHDC. | D0170 Request for SVA Metering System Related Details. | Electronic or other method, as agreed. |
3.2.4.10 | Within 5 WD of request for historic data. | Send historic HH Metered Data as available. | Old HHDC. | New HHDC. | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. | Electronic or other method, as agreed. |
3.2.4.11 | If required | Request final Meter read | New HHDC | Old HHDC |
| Letter/Fax/Email |
3.2.4.12 | Within 5 WD of 3.2.4.10 | Send final Meter read | Old HHDC | New HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
3.2.4.13 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the HHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by Supplier. | Request final physical Meter Read | New HHDC | Old HHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 4.8 - Meter Advance Reconciliation12. | Letter/Fax/Email |
3.2.4.14 | Within 5 WD of 3.2.4.13 | Send final physical Meter Read | Old HHDC | New HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
For Supplier-serviced Metering Systems. | ||||||
3.2.4.15 | From HHDC appointment start date. | Collect HH Metered Data. | Supplier |
|
| Internal Process. |
3.2.4.16 | As required and before Final Reconciliation Volume Allocation Run . | Request 14 months of historic HH Metered Data. | New HHDC. | Old HHDC. | D0170 Request for SVA Metering System Related Details. | Electronic or other method, as agreed. |
3.2.4.17 | Within 5 WD of request for historic data. | Send historic HH Metered Data as available. | Old HHDC. | New HHDC. | D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.5.1 | . Within 1 WD of receipt of D0011 from SVA MOA. | Send ID of new SVA MOA. | Supplier. | HHDC. | D0148 Notification of Change to Other Parties. | Electronic or other method, as agreed. |
For HHDC-serviced Metering Systems13. | ||||||
3.2.5.2 | Within 5 WD of receipt of MTD from old SVA MOA. | Send MTD to HHDC. | New SVA MOA. | HHDC. | D0268 Half Hourly Meter Technical Details. If site is complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.2.5.3 | In accordance with timescales in Appendix 4.6. | Prove MS in accordance with the rules defined in Appendix 4.6 | New SVA MOA. | New HHDC. | Refer to Appendix 4.6. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.6.1 | Within 1 WD of confirmation of change of HHDA (receipt of D0172, D0213 or D0011) | Send start date and ID of the new HHDA for the MS. | Supplier. | HHDC. | D0148 Notification of Change to Other Parties. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.7.1 | By SSD – 1 WD | Send notification of appointment | New Supplier. | New HHDC. | D0155 Notification of New Meter Operator or Data Collector Appointment and Terms10
| Electronic or other method, as agreed. |
3.2.7.2 | Upon receipt of SVA MS details. | Record SVA MS details. Validate SVA MS details received from the Supplier against MDD received from the SVAA and send D0011to the Supplier. | New HHDC. | New Supplier. | D0011 Agreement of Contractual terms. Sufficient details of HHDC’s appointment in respect of a SVA MS to enable the HHDC to perform its HHDC functions. These details shall include the relevant SVA MSID and the Identifiers for the SVA MOA and, as the case may be, the HHDA, the LDSO and the applicable GSP Group. The details shall also include the Settlement Days for which the HHDC and HHDA are appointed. | Electronic or other method, as agreed. |
3.2.7.3 | Within 1 WD of receiving all applicable D0011s | Send appointment details of MS, including start date and IDs of HHDA, SVA MOA and old HHDC. | New Supplier. | New HHDC. | D0148 Notification of Change to Other Parties. D0289 Notification of MC/EAC/PC7 D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
3.2.7.4 | By SSD | Send appointment termination date for MS. | Old Supplier. | Old HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
For HHDC-serviced Metering Systems. | ||||||
3.2.7.5 | Within 10 WD after end of old HHDC appointment to old Supplier. | Complete data collection activities for the old Supplier. | Old HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.2.7.6 | Within 5 WD of 3.2.7.45 | Send MTD and details of any current faults. | SVA MOA | New HHDC | D0002 Fault Resolution Report or Request for Decision on Further Action. D0268 Half Hourly Meter Technical Details. If site is complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.2.7.7 | In accordance with timescales in Appendix 4.6. | Prove MS. | SVA MOA. | New HHDC. | Refer to Appendix 4.6. | Electronic or other method, as agreed. |
3.2.7.8 | On agreement of reading schedule between new Supplier and new HHDC. | Send Meter reading schedule. | New HHDC. | Supplier, LDSO | D0012 Confirmation of the Inclusion of the Metering Point in the Reading Schedules. | Electronic or other method, as agreed. |
3.2.7.9 | From appointment start date of new HHDC to new Supplier. | Collect HH Metered Data for new Supplier including an initial Meter reading. | New HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.2.7.10 | Before Final Reconciliation Volume Allocation Run11 | Request 14 months of historic Metered Data | New HHDC. | Old HHDC. | D0170 Request for Metering System Related Details. | Electronic or other method, as agreed. |
3.2.7.11 | Within 5 WD of request for historic data. | historic HH Metered Data as available. | Old HHDC. | New HHDC. | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. | Electronic or other method, as agreed. |
3.2.7.12 | If required | Request final Meter read | New HHDC | Old HHDC |
| Letter/Fax/Email. |
3.2.7.13 | Within 5 WD of 3.2.7.12 | Send final Meter read | Old HHDC | New HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
3.2.7.14 | If there is a separate outstation (or integral outstation that does not provide a cumulative electronic reading) and within 10 WD of the later of the HHDC appointment start date and receipt of Meter Technical Details (unless physical read acquired through site visit within 10 WD of appointment start date); or if required by Supplier. | Request final physical Meter Read | New HHDC | Old HHDC | This reading is required for use in the Meter Advance Reconciliation process - Appendix 4.8 - Meter Advance Reconciliation14. | Letter/Fax/Email. |
3.2.7.15 | Within 5 WD of 3.2.7.14 | Send final physical Meter Read | Old HHDC | New HHDC | D0010 Meter Readings | Electronic or other method, as agreed. |
For Supplier-serviced Metering Systems. | ||||||
3.2.7.16 | From HHDC appointment start date. | Collect HH Metered Data. | Supplier. |
|
| Internal Process. |
3.2.7.17 | As required and before Final Reconciliation Volume Allocation Run. | Request 14 months of historic HH Metered Data. | New HHDC. | Old HHDC. | D0170 Request for SVA Metering System Related Details. | Electronic or other method, as agreed. |
3.2.7.18 | Within 5 WD of request for historic data. | Send historic HH Metered Data as available. | Old HHDC. | New HHDC. | D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.2.8.1 | By New Supplier SSD | Send appointment details | New Supplier. | New HHDC. | D0155 Notification of New Meter Operator or Data Collector Appointment and Terms10 | Electronic or other method, as agreed. |
3.2.8.2 | Within 2 WD of 3.2.8.1 | Record SVA MS details. Validate SVA MS details received from the Supplier against MDD received from the SVAA and send D0011to the Supplier. | New HHDC. | New Supplier. | D0011 Agreement of Contractual terms.
| Electronic or other method, as agreed. |
3.2.8.3 | Within 1 WD of receiving all applicable D0011s | Send appointment details of MS, including start date and IDs of HHDA, SVA MOA and old HHDC. | New Supplier. | New HHDC. | D0148 Notification of Change to Other Parties. D0289 Notification of MC/EAC/PC7. D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
3.2.8.4 | By New Supplier SSD | Send appointment termination date for MS. | Old Supplier. | Old HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
For HHDC-serviced Metering Systems. | ||||||
3.2.8.5 | By SSD | Send MTD and details of any current faults. | SVA MOA | New HHDC | D0268 Half Hourly Meter Technical Details. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.1.1 | Prior to CoMC date change16 or Within 5 WD of coincident CoS and CoMC change17. | Send notification of appointment | New Supplier. | HHDC. | D0155 Notification of New Meter Operator or Data Collector Appointment and Terms.
| Electronic or other method, as agreed. |
3.3.1.2 | Within 2 WD of 3.3.1.1 | Send confirmation of appointment acceptance | HHDC. | New Supplier. | D0011 Agreement of Contractual terms. | Electronic or other method, as agreed. |
3.3.1.3 | Within 1 WD of receiving all applicable D0011s | Send notification of appointment, including start date and associated Agent details. | New Supplier. | HHDC. | D0148 Notification of Change to Other Parties. D0289 Notification of MC/EAC/PC. D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
3.3.1.4 | Within 5 WD of change or Within 5 WD of coincident CoS and CoMC change. | Send initial Meter reading(s) with date and time in GMT. Send MTD | SVA HH MOA. | Supplier / HHDC18 / LDSO. HHDC | D0010 Meter Readings. D0268 Half Hourly Meter Technical Details If site is complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.3.1.5 | On agreement of Meter reading schedule with Supplier following 3.3.1.2. | Send Meter reading schedule. | HHDC. | Supplier, LDSO | D0012 Confirmation of the Inclusion of the Metering Point in the Reading Schedules. | Electronic or other method, as agreed. |
3.3.1.6 | From HHDC appointment start date. | Collect HH Metered Data. | HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.3.1.7 | In accordance with timescales in Appendix 4.6. | Prove MS. | SVA HH MOA. | HHDC. | Refer to Appendix 4.6. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.2.1 | Before planned date of change of measurement class. | Send Id of new SVA NHHMOA and request to collect final HH Metered Data. | Current Supplier. | HHDC. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.3.2.2 | Within 3 WD of 3.3.2.1 and before planned date of change of measurement class. | Arrange date by when final HH Metered Data should be collected. (Note that for the day of the change consumption for the half hour periods after the time of the change are set to zero). | HHDC. | SVA NHH MOA. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.3.2.3 | On date and time agreed in 3.3.2.2. | Collect final HH Metered Data. | HHDC. |
|
| Internal Process. |
3.3.2.4 | Immediately following 3.3.2.3. | Confirm final HH Metered Data collection. | HHDC. | SVA NHH MOA. | The SVA MOA will telephone the HHDC when the SVA MOA is on site or is ready to reconfigure the MS remotely. Following the HHDC collecting the data, the HHDC will provide confirmation to the SVA MOA. | Telephone. |
3.3.2.5 | Within 5 WD of receipt of final Meter register reading. | Send final Meter register reading. | SVA HH MOA. | HHDC / Supplier. | D0010 Meter Readings. | Electronic or other method, as agreed. |
3.3.2.6 | On termination of appointment of HHDC. | Send appointment termination date for MS. | Current Supplier. | HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
3.3.2.7 | If no Meter register reading received within 10 WD of CoMC and initial reading required19 | Request initial Meter register reading. | NHHDC | Supplier |
| Post / Fax / Email |
3.3.2.8 | Within 10 WD of 3.3.2.7 | Send initial Meter register reading. | Supplier | NHHDC | D0010 Meter Readings | Electronic or other method as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.3.1 | Within 5 WD of changing energisation status or Within 10 WD for Supplier-serviced Metering Systems. or Within 5 WD of receipt of change of energisation status. | Send change of energisation status and the initial Meter register reading. Send change of energisation status and, if requested, the initial Meter register reading. | SVA MOA20. | Supplier, LDSO. HHDC21 | D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
3.3.3.2 | Upon receipt of notification of SVA MS energisation status change. | Record notification by SVA MOA or Supplier of SVA MSs which have been energised and the dates on which they were energised. | HHDC. |
| Details of SVA MSs which have been energised and the dates on which they were energised. | Internal Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
If SVA MOA De-energises (LV MS) | ||||||
3.3.4.1 | Within 3 WD of request to de-energise MS from Supplier and before planned date for de-energisation. | Arrange with HHDC to collect HH Metered Data. For Supplier- serviced Metering Systems, the Supplier, rather than the HHDC, will collect the HH Metered Data. Steps 3.3.4.1 to 3.3.4.3 do not apply. | SVA MOA. | HHDC. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.3.4.2 | On date and time agreed in 3.3.4.1. | Collect HH Metered Data. | HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.3.4.3 | Immediately following 3.3.4.2 | Confirm HH Metered Data collection. | HHDC. | SVA MOA. | The SVA MOA will telephone the HHDC when the SVA MOA is on site. Following the HHDC collecting the data, the HHDC will provide confirmation to the SVA MOA. | Telephone. |
3.3.4.4 | Within 5 WD of changing energisation status or Within 10 WD for Supplier-serviced Metering Systems. | Send change of energisation status and final Meter register reading. | SVA MOA. | HHDC21 Supplier, LDSO. | D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
3.3.4.5 | Upon receipt of notification of SVA MS energisation status change. | Record notification by SVA MOA or Supplier of SVA MSs which have been de-energised and the dates on which they were de-energised. | HHDC |
| Details of SVA MSs which have been de-energised and the dates on which they were de-energised. | Internal Process. |
If LDSO De-energises (HV MS) | ||||||
3.3.4.6 | Within 2 WD of agreeing date and time for de-energisation with LDSO MS and before planned date for de-energisation. | Arrange with HHDC to collect HH Metered Data. | SVA MOA. | HHDC. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.3.4.7 | On date and time agreed in 3.3.4.5. | Collect HH Metered Data. | HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.3.4.8 | Immediately following 3.3.4.6 | Confirm HH Metered Data collection. | HHDC. | SVA MOA. | The SVA MOA will telephone the HHDC when the SVA MOA is on site. Following the HHDC collecting the data, the HHDC will provide confirmation to the SVA MOA. | Telephone. |
3.3.4.9 | Within 5 WD of receipt of change of energisation status. | Send change of energisation status and, if requested, the final Meter register reading. | SVA MOA. | HHDC21 | D0139 Confirmation or Rejection of Energisation Status Change. | Electronic or other method, as agreed. |
3.3.4.10 | Upon receipt of notification of SVA MS energisation status change. | Record notification by SVA MOA or Supplier of SVA MSs which have been de-energised and the dates on which they were de-energised. | HHDC. |
| Details of SVA MSs which have been de-energised and the dates on which they were de-energised. | Internal Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.5.1 | On confirmation from CSS of registration deactivation. | Send end date for MS. | Supplier. | HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.6.1 | Within 3 WD of request from Supplier to replace / reconfigure MS and before data collection date. | Arrange with HHDC to collect HH Metered Data. | SVA MOA. | HHDC. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.3.6.2 | On date or time agreed in 3.3.6.1. | Collect HH Metered Data. | HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.3.6.3 | Immediately following 3.3.6.2. | Confirm HH Metered Data collection. | HHDC. | SVA MOA. | The SVA MOA will telephone the HHDC when the SVA MOA is on site. Following the HHDC collecting the data, the HHDC will provide confirmation to the SVA MOA. | Telephone. |
3.3.6.4 | Within 5 WD of the replacement / reconfiguration of the MS | Send final Meter register reading for replaced / reconfigured MS or notification that Meter register reading not obtainable. | SVA MOA. | Supplier / HHDC / LDSO. | D0010 Meter Readings. D0002 Fault Resolution Report or Request for Decision on further Action. Also refer to Section 3.4.1 for processing data for old configuration. | Electronic or other method, as agreed. |
3.3.6.5 | Within 5 WD of the replacement / reconfiguration of the MS | Send initial Meter register reading for replacement MS / new configuration. Send MTD. | SVA MOA. | Supplier / HHDC LDSO. HHDC | D0010 Meter Readings. D0268 Half Hourly Meter Technical Details. If site is complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.3.6.6 | After planned date for replacement / reconfiguration of MS. | Collect HH Metered Data for replacement MS / new configuration. | HHDC. |
| Refer to Section 3.4.1. | Internal Process. |
3.3.6.7 | In accordance with timescales in Appendix 4.6. | Prove MS. | SVA MOA. | HHDC. | Refer to Appendix 4.6. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.8.1 | Within 5 WD of identification of CoMC change. | Send notification of Measurements Class change as either above or below 100kW. | Supplier. | HHDC. | D0289 Notification of MC/EAC/PC7. | Electronic or other method, as agreed. |
3.3.8.2 | Within 1 WD of 3.3.8.1. | Record revised Measurement Class type. | HHDC. |
|
| Internal Process. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.9.1 | Within 5 WD of changing feeder status. | If requested, send Meter register reading. Send MTD. | SVA MOA25. | HHDC Supplier / HHDC / LDSO. | D0010 Meter Readings. D0268 Half Hourly Meter Technical Details. If site is Complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.3.9.2 | In accordance with timescales in Appendix 4.6. | Prove MS if feeder has been energised for the first time. | SVA MOA. | HHDC. | Refer to Appendix 4.6. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.10.1 | Within 3 WD of request to de-energise feeder and before data collection date or as the SVA MOA sees necessary. | Arrange with HHDC to collect HH Metered Data. | SVA MOA25. | HHDC. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.3.10.2 | On the date and time agreed in 3.3.10.1. | Collect HH Metered Data. | HHDC. |
|
| Internal Process. |
3.3.10.3 | Immediately following 3.3.10.2. | Confirm HH Metered Data collection. | HHDC. | SVA MOA. | The SVA MOA will telephone the HHDC when the SVA MOA is on site. Following the HHDC collecting the data, the HHDC will provide confirmation to the SVA MOA. | Telephone. |
3.3.10.4 | Immediately following 3.3.10.3. | Note Meter register reading, if available. If HH Metered Data was not uploaded by the HHDC, download HH Metered Data, if available. Change feeder status. | SVA MOA. |
|
| Internal Process. |
3.3.10.5 | Within 5 WD of changing feeder status. | If requested, send Meter register reading or notification that Meter register reading not obtainable. Send MTD. | SVA MOA. | HHDC. Supplier / HHDC / LDSO. | D0010 Meter Readings. D0268 Half Hourly Meter Technical Details. If site is Complex, send Complex Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.11.1 | Prior to CoMC date change. or Within 5 WD of coincident CoS and CoMC. | Send notification of appointment | New Supplier. | HHDC. | D0155 Notification of New Meter Operator or Data Collector Appointment and Terms10.
| Electronic or other method, as agreed. |
3.3.11.2 | Within 2 WD of 3.3.11.1 | Send Confirmation of Appointment. | HHDC. | New Supplier. | D0011 Agreement of Contractual terms | Electronic or other method, as agreed. |
3.3.11.3 | Within 1 WD of receiving all applicable D0011s | Send notification of appointment, including start date and associated Agent details. The sending of the D0302 is optional. | New Supplier. | HHDC. | D0148 Notification of Change to Other Parties. D0289 Notification of MC/EAC/PC7. D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.12.1 | Prior to CoMC date change Or Within 5 WD of CoMC. | Send notification of appointment | Supplier. | HHDC. | D0155 Notification of New Meter Operator or Data Collector Appointment and Terms10.
| Electronic or other method, as agreed. |
3.3.12.2 | Within 2 WD of 3.3.12.1 | Send Confirmation of Appointment. | HHDC. | Supplier. | D0011 Agreement of Contractual terms. | Electronic or other method, as agreed. |
3.3.12.3 | Within 1 WD of receiving all applicable D0011s | Send notification of appointment, including start date and associated Agent details. The sending of the D0302 is optional. | Supplier. | HHDC. | D0148 Notification of Change to Other Parties. D0289 Notification of MC/EAC/PC7. D0302 Notification of Customer Details. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.13.1 | On termination of appointment of HHDC. | Send appointment termination date for MS. | Current Supplier. | HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
3.3.13.2 | Following the HHDC termination date. | Collect HH data up until midnight on HHDC termination date and send to HHDC. | Current Supplier. | HHDC. | Refer to Section 3.4. D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix or D0379 Half Hourly Advances UTC. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.14.1 | On termination of appointment of HHDC. | Send appointment termination date for MS. | Supplier. | HHDC. | D0151 Termination of Appointment or Contract by Supplier. | Electronic or other method, as agreed. |
3.3.14.2 | Following the HHDC termination date. | Collect HH data up until midnight on HHDC termination date and send to HHDC. | Supplier. | HHDC. | Refer to Section 3.4. D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix or D0379 Half Hourly Advances UTC. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.3.15.1 | If SVA Metering System replacement: Within 3 WD of request from Supplier to replace / reconfigure MS and before data collection date. | Liaise with Supplier to collect HH Metered Data. | SVA MOA. | Supplier. | As agreed. | Electronic or other method, as agreed. |
3.3.15.2 | On date or time agreed in 3.3.15.1 or prior to replacement/ reconfiguration. | Collect HH Metered Data. | Supplier. |
|
| Internal Process. |
3.3.15.3 |
| Reconfigure the SVA Metering System and send HH data to HHDC. | Supplier. | HHDC. | Refer to Section 3.4. D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix or D0379 Half Hourly Advances UTC. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.1.1 | As appropriate. | Collect26 and validate HH Metered Data and check items at site. | HHDC. |
| Refer to Appendix 4.1, Appendix 4.2, Appendix 4.3, and where relevant Appendix 4.8. | Internal Process. |
3.4.1.2 | Not less than once every calendar month. | In respect of de-energised SVA MSs where communications equipment is available on site, attempt remote data collection. | HHDC. |
|
| Internal Process. |
3.4.1.3 | Annually. | In respect of de-energised SVA MSs which do not include communications equipment or for which the communications equipment is not functioning correctly, make a site visit to attempt data collection. | HHDC. |
|
| Internal Process. |
3.4.1.4 | Following visiting site and in accordance with timescales in Appendix 4.1 and 4.8. | Provide relevant reports.
If unable to obtain Meter reading, the HHDC will inform the Supplier | HHDC.
HHDC. |
SFIC.
Supplier, SVA MOA. Supplier, SVA MOA and (if requested) LDSO.
Supplier.
| Refer to Appendix 4.1 and where relevant Appendix 4.8. D0135 Report Possible Safety Problem. D0136 Report to Supplier of Possible Irregularity. D0008 Meter Advance Reconciliation Report in accordance with Appendix 4.8.
D0004 Notification of Failure to Obtain Reading | Electronic or other method, as agreed. |
3.4.1.5 | When fault suspected with metering or communications equipment. | Investigate and report any faults detected. | HHDC. |
| Refer to Section 3.4.2. | Internal Process. |
3.4.1.6 | Within 2 WD of detecting consumption on de-energised metering or if maximum permissible energy exceeds that allowed. | Report any consumption detected on de-energised metering and escalate any occurrences where the energy recorded, for any Settlement Period, exceeds the maximum permissible on energised metering. | HHDC. |
Supplier, SVA MOA. | Refer to Appendix 4.1 D0001 Request Metering System Investigation. | Internal Process. Electronic or other method, as agreed. |
3.4.1.7 | When maximum permissible energy exceeds that allowed. | Send notification of action to be taken. | Supplier. | HHDC. | D0005 Instruction on Action. The HHDC will be instructed to validate the actual data or to replace the actual data with estimated successfully validated data. | Electronic or other method, as agreed. |
3.4.1.8 | Following 3.4.1.7. | Undertake action requested by Supplier or if no response provided by Supplier apply the rules defined in Appendix 4.1. | HHDC. |
|
| Internal Process. |
3.4.1.9 | If no response received from Supplier and following 3.4.1.8. | Report any occurrences where estimated consumption data used because energy recorded exceeds that allowed and Supplier has not provided an appropriate course of action. | HHDC. | BSCCo. | P0208 Estimation Due To High Energy Recorded. | Manual. |
3.4.1.10 | Where required. | Provide operational data or additional information where the exceptions identified in Appendix 4.2 are met. | Supplier. | HHDC. | In accordance with Appendix 4.2. | Electronic or other method, as agreed. |
3.4.1.11 | When data is invalid or cannot be retrieved or if requested by Supplier to estimate consumption or if energy exceeds that allowed by more than the limit defined in 3.4.1.6. | Estimate consumption data. Send estimated consumption data report. | HHDC. | Supplier, LDSO. | Refer to Appendix 4.2. D0022 Estimated Half Hourly Data Report. | Internal Process. Electronic or other method, as agreed. |
3.4.1.12 | As agreed with Supplier and prior to next Volume Allocation Run and if requested by Supplier to use data following 3.4.1.7. | Validate consumption data (actual and estimated). | HHDC27. |
| Refer to Appendix 4.1. | Internal Process. |
|
| Send valid consumption data (including data for Unmetered Supplies)28 | HHDC | HHDA. | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix.
OR
D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix (This option is only available in respect of Unmetered Supplies).
D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix OR D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix (This option is only available in respect of Unmetered Supplies).
| Electronic or other method, as agreed. |
|
| Send valid consumption data (including data for Unmetered Supplies) | HHDC. | Supplier.29 | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. AND/OR D0275 Validated Half Hourly Advances.
OR D0379 Half Hourly Advances UTC (This option is only available in respect of Unmetered Supplies). | Electronic or other method, as agreed. |
| On a monthly basis, subject to availability.30 | Send cumulative register read. | HHDC. | LDSO. | For Metering Systems registered to any either Measurement Class F or G: D0010 Meter Readings. | Electronic or other method, as agreed. |
|
| Send valid consumption data (including data for Unmetered Supplies). | HHDC. | LDSO.29 | For Metering Systems registered to any other Measurement Class: D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. AND/OR D0275 Validated Half Hourly Advances. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.2.1 | At any time, if appropriate. | Send notification of inconsistencies. | Any Participant. | Supplier.31 | Details of inconsistencies (e.g. invalid data, faulty metering, invalid MTD etc.). | Electronic or other method, as agreed. |
3.4.2.2 | Within 2 WD of 3.4.2.1 (if applicable), or as required. | Send notification of inconsistencies and request investigation. Go to 3.4.2.4. | Supplier. | HHDC. | D0001 Request Metering System Investigation. | Electronic or other method, as agreed. |
3.4.2.3 | If required, following data aggregation exception | Send notification of inconsistencies and request investigation. | HHDA. | HHDC, Supplier. | D0235 Half Hourly Aggregation Exception Report. | Electronic or other method, as agreed. |
3.4.2.4 | Within 5 WD of 3.4.2.2 or 3.4.2.3 as appropriate. | Investigate inconsistencies. Take corrective action if possible. Go to 3.4.2.5 if a MS investigation is required, 3.4.2.6 if inconsistencies have been resolved and a MS investigation was not required, or 3.4.2.10 if inconsistencies remain unresolved and a MS investigation was not required. | HHDC. |
|
| Internal Process. |
3.4.2.5 | Following 3.4.2.4 if a MS investigation is required. | Initiate process 3.4.3. | HHDC. |
|
|
|
3.4.2.6 | Within 5 WD of resolution of inconsistencies, if a MS investigation was not required. | Report resolution of inconsistencies. | HHDC. | Supplier. | D0002 Fault Resolution Report or Request for Decision on Further Action. | Electronic or other method, as agreed. |
3.4.2.7 | If appropriate, within 5 WD of 3.4.2.6. | Report resolution of inconsistencies. | Supplier. | Relevant Participant. | As appropriate: D0002 Fault Resolution Report or Request for Decision on Further Action. Details of resolution. | Electronic or other method, as agreed. |
3.4.2.8 | If appropriate, following 3.4.2.6. | If a problem has caused incorrect consumption to be recorded, estimate / correct consumption data. | HHDC.32 |
| Refer to Appendix 4.2 if appropriate. | Internal Process. |
3.4.2.9 | As soon as possible following 3.4.2.8. | Send corrected data. | HHDC. | Supplier, LDSO. | D0022 Estimated Half Hourly Data Report. D0275 Validated Half Hourly Advances.33 | Electronic or other method, as agreed. |
|
|
| HHDC. | Supplier, LDSO, HHDA. | D0036 Validated Half Hourly Advances for Inclusion in Aggregated Supplier Matrix.33 Or D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. |
|
3.4.2.10 | As soon as possible if inconsistencies remain unresolved but a MS investigation was not required. | Report action required. | HHDC. | Supplier. | Details of action required. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.3.1 | As appropriate. | Send request to investigate MS. | Supplier or HHDC. | SVA MOA. | D0001 Request Metering System Investigation. See Appendix 4.4 for list of example circumstances where this request may be made. | Electronic or other method, as agreed. |
3.4.3.2 | If fault resolved within 5 WD of receipt of D0001. | Go to 3.4.3.10. | SVA MOA. |
|
|
|
3.4.3.3 | If fault remains unresolved 5 WD after receipt of D0001. | Send notification that the fault cannot be resolved within 5WD, and send a corresponding fault resolution plan (if required) detailing the actions that need to be taken to resolve the fault and the proposed timescales or update on proposed next steps. Request decision on further action if appropriate. | SVA MOA. | Supplier or HHDC.34 | D0005 Instruction on Action, or equivalent information to Supplier.35 | Electronic or other method, as agreed. |
Fault resolution plan (if required). | Fax, Email or other method, as agreed. | |||||
3.4.3.4 | As soon as possible after 3.4.3.3, if appropriate. | Send decision on further action. | Supplier HHDC. | SVA MOA. | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.4.3.5 | If fault resolved within 15 WD of receipt of D0001. | Go to 3.4.3.10. | SVA MOA. |
|
|
|
3.4.3.6 | If fault remains unresolved 15 WD after receipt of D0001. | Notify that the fault remains unresolved. | SVA MOA. | Supplier or HHDC. | D0005 Instruction on Action or equivalent information to Supplier. | Electronic or other method, as agreed. |
3.4.3.7 | As soon as possible after 3.4.3.6. | Send update on investigation.36 | Supplier or HHDC. | Supplier or HHDC. | Details of update. | As agreed. |
3.4.3.8 | Following 3.4.3.6, if and when appropriate. | Consult and / or update HHDC regarding investigation on a regular basis (as agreed) until fault resolved. | SVA MOA. | HHDC.34 | D0005 Instruction on Action. | Electronic or other method, as agreed. |
3.4.3.9 | As soon as possible after 3.4.3.8. | Send update on investigation.36 | HHDC. | Supplier. | Details of update. | As agreed. |
3.4.3.10 | Within 5 WD of resolving fault. | Send fault resolution report and undertake any steps in process 3.3.6 which may be appropriate. | SVA MOA. | HHDC, Supplier. | D0002 Fault Resolution Report or Request for Decision on Further Action. | Electronic or other method, as agreed. |
3.4.3.11 | If appropriate, at the same time as 3.4.3.10. | Send MTD, if changed or corrected. | SVA MOA. | Supplier, HHDC, LDSO. | D0268 Half Hourly Meter Technical Details. If site is Complex refer to Appendix 4.9. | Electronic or other method, as agreed. |
3.4.3.12 | In accordance with timescales in Appendix 4.6. | If MTD manually intervened or there has been a key field change, prove MS. | SVA MOA. | HHDC. | Refer to Appendix 4.6 and process 3.5. | Electronic or other method, as agreed. |
3.4.3.13 | If appropriate, following 3.4.3.10. | Where an investigation indicates that a fault has caused incorrect consumption to be recorded, estimate / correct consumption data. | HHDC or Supplier. |
| Refer to Appendix 4.2 if appropriate. | Internal Process. |
3.4.3.14 | As soon as possible following 3.4.3.13. | Send corrected data. | HHDC or Supplier. | Supplier, LDSO.
HHDC | Refer to Section 3.4.1 or 3.4.6 as appropriate | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.5.1 | Within the period of 1WD commencing on the Business Day after the BMRA receives the data from the NETSO specified in Section Q6.9.5 | Notice of the DCE sent to all Category A Authorised Persons, to establish the appropriate operational contact. The Category A Authorised Persons will be used as the contact unless another contact is provided | BSCCo | Category A Authorised Persons from BSC Parties and Party Agents | Notice of the DCE | Email or other method, as agreed. |
3.4.5.2 | Within the period of 1WD commencing on the Business Day after the BMRA receives the data from the NETSO specified in Section Q6.9.5 | BSCCo will assess the costs and value of the DCE in accordance with the Demand Disconnection Event Threshold Rules and notify BSC Parties, Party Agents and BSC Panel Members of the outcome of its assessment | BSCCo | BSC Parties, Party Agents and BSC Panel | Notice of the outcome of BSCCo’s assessment | Email, Circular, BSC Website |
3.4.5.3 | Within 5WD of 3.4.521 | Send notification of Demand Control Event and all affected MSIDs37 | LDSO | BSCCo | P0238 MSIDs affected by Demand Control Event38 - the P0238 contains details of all MSIDs disconnected by the LDSO, i.e. for a single Demand Control Event, a single P0238 is sent by the LDSO, ultimately, to all DCs and DAs. | Email to bscservicedesk@cgi.com |
3.4.5.4 | Within 1WD of 3.4.5.3 | Acting on behalf of LDSOs, BSCCo will forward notifications received from LDSOs to HHDCs, HHDAs, SVAA | BSCCo | HHDC, HHDA, SVAA | P0238 MSIDs affected by Demand Control Event |
|
3.4.5.5 | Within 19WD of receipt of P0238 in 3.4.5.4 | Estimate HH Demand Disconnection volume according to appendix 4.2.5 and send to HHDA | HHDC | HHDA | D0375 Disconnected MSIDs and Estimated Half Hourly Demand Disconnection Volumes39 40 Appendix 4.2.5 Demand Control – Disconnection volume Estimates | Electronic or other method, as agreed |
3.4.5.6 | Within 1WD of receiving P0241 from the NETSO | Notify Data Collectors and Data Aggregators of any MSIDs subject to demand side Non-BM STOR instruction along with estimated volumes of reduction41 | SVAA | HHDC | D0375 Disconnected MSIDs and Estimated Half Hourly Demand Disconnection Volumes | Electronic or other method, as agreed |
3.4.5.7 | If required, following receipt of D0375 in 3.4.5.6 and in time for next Settlement Run | Adjust estimated HH Demand Disconnection volume according to appendix 4.2.5 and send to HHDA | HHDC | HHDA | D0375 Disconnected MSIDs and Estimated Half Hourly Demand Disconnection Volumes | Electronic or other method, as agreed |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.4.6.1 | As appropriate | Send Service request via DCC to retrieve data from smart Meter profile data log | Supplier | DCC | HH profile data from smart meter | DCC Service Request |
3.4.6.2 | When fault suspected with metering or communications equipment. | Supplier investigates and arranges for SVA MOA to resolve | Supplier | Refer to Section 3.4.3. | Internal Process. | When fault suspected with metering or communications equipment. |
3.4.6.3 | Within 2 WD of detecting consumption on de-energised metering or if maximum permissible energy exceeds that allowed. | Report any consumption detected on de-energised metering and escalate any occurrences where the energy recorded, for any Settlement Period, exceeds the maximum permissible on energised metering. | Supplier | SVA MOA. | Refer to Appendix 4.1 D0001 Request Metering System Investigation. | Internal Process. Electronic or other method, as agreed. |
3.4.6.4 | If validation and estimation undertaken by Supplier and prior to next Volume Allocation Run | Validate consumption data. When data is invalid or cannot be retrieved: Estimate consumption data. | Supplier | Refer to Appendix 4.11 and 4.1 | Internal Process. |
|
3.4.6.5 | Following 3.4.6.4 | Send validated consumption data (actual and estimated) | Supplier | HHDC | Validated D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix or D0379 Half Hourly Advances UTC | Electronic or other method, as agreed. |
3.4.6.6 | If Supplier not validating the HH Metered data and prior to next Volume Allocation Run | Send non-validated consumption data. | Supplier | HHDC | Non-validated D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix or D0379 Half Hourly Advances UTC or raw profile log data with other information as required | Electronic or other method, as agreed. |
3.4.6.7 | Following 3.4.6.6 | Validate and estimate consumption data, where required. | HHDC | Refer to Appendix 4.11 and 4.1 | Internal Process. |
|
3.4.6.8 | (Optional) When data is invalid, cannot be retrieved by Supplier, is missing for a HHDC appointment or if requested by Supplier to estimate consumption or if energy exceeds that allowed by more than the limit for SMETS Meters defined in 4.2. | Estimate consumption data. Send estimated consumption data report. | HHDC. | Supplier, | Refer to Appendix 4.2. D0022 Estimated Half Hourly Data Report. | Internal Process. Electronic or other method, as agreed. |
3.4.6.9 |
| Send valid consumption data | HHDC | HHDA. | D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. | Electronic or other method, as agreed. |
3.4.6.10 |
| Send valid consumption data | HHDC. | Supplier. | D0380 Half Hourly Advances for Inclusion in Aggregated Supplier Matrix. | Electronic or other method, as agreed. |
3.4.6.11 | On a monthly basis, subject to availability | Send cumulative register read. | Supplier | LDSO. | For Metering Systems registered to either Measurement Class F or G: D0010 Meter Readings. | Electronic or other method, as agreed. |
REF | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD | |
3.5.1.1 | Following installation / reconfiguration, commissioning and once HH Metered Data retrieved or if previous proving test attempt failed. | Send request for proving test (indicating which Settlement Periods to be collected) or alternatively request re-test following failure of immediately preceding proving test and provide MTD. | SVA MOA. | HHDC. | D0005 Instruction on Action. D0268 Half Hourly Meter Technical Details. If site is complex, send Complex Site Supplementary Information Form. Refer to Appendix 4.9 Guide to Complex Sites. | Electronic or other method, as agreed. |
3.5.1.2 |
| Obtain the same HH Settlement Period Meter reading as requested by the SVA MOA using either a Hand Held Unit or via remote interrogation as appropriate (ensuring that data collected for the Settlement Period does not contain a zero value). | HHDC. |
| As a minimum the HHDC shall obtain the data required by the SVA MOA, but may also obtain and send more data than requested. | Internal Process. |
3.5.1.3 |
| Send raw HH Metered Data or notification that Metered Data cannot be collected for the Settlement Periods requested 47. If unable to collect metering data for Settlement Period requested, send alternative Settlement Period HH Metered Data. | HHDC. | SVA MOA. | D0001 Request Metering System Investigation. D0003 Half Hourly Advances. | Electronic or other method, as agreed. |
REF | WHEN 45 46 | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.2.1 | Following installation / reconfiguration, commissioning and once HH Metered Data retrieved or if previous proving test attempt failed. | Agree date and time for proving test with HHDC or alternatively request re-test following failure of immediately preceding proving test and provide MTD. | SVA MOA. | HHDC. | D0005 Instruction on Action. D0268 Half Hourly Meter Technical Details. | Electronic or other method, as agreed. |
3.5.2.2 |
| Obtain the same HH Settlement Period Meter reading as agreed with the SVA MOA using the either a Hand Held Unit or via remote interrogation as appropriate (ensuring that data for the Settlement Period collected does not contain a zero value). | HHDC. |
| As a minimum the HHDC shall obtain the data required by the SVA MOA, but may also obtain and send more data than requested. | Internal Process. |
3.5.2.3 |
| Send raw HH Metered Data or notification that Metered Data cannot be collected.47 If unable to collect HH Metered Data for agreed Settlement Period, send alternative Settlement Period HH Metered Data. | HHDC. | SVA MOA. | D0001 Request Metering System Investigation. D0003 Half Hourly Advances. | Electronic or other method, as agreed. |
REF | WHEN 45 46 | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.3.1 | Following installation, commissioning and once HH Metered Data retrieved. | Send request for proving test or alternatively request a re-test following failure of immediately preceding proving test and provide MTD48 | SVA MOA. | HHDC. | D0005 Instruction on Action. D0268 Half Hourly Meter Technical Details. | Electronic or other method, as agreed. |
3.5.3.2 |
| Obtain for Settlement Period Meter reading of own choosing either a Hand Held Unit or via remote interrogation as appropriate (ensuring that data for the Settlement Period collected does not contain a zero value). | HHDC. |
|
| Internal Process. |
3.5.3.3 |
| Send raw HH Metered Data or notification that Metered Data cannot be collected. | HHDC. | SVA MOA. | D0001 Request Metering System Investigation. D0003 Half Hourly Advances. | Electronic or other method, as agreed. |
REF | WHEN 45 46 | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.4.1 | Following installation / reconfiguration, commissioning and once HH Metered Data retrieved. | Send request for proving test or alternatively request a re-test following failure of immediately preceding proving test and provide MTD48. | SVA MOA. | HHDC. | D0005 Instruction on Action. D0268 Half Hourly Meter Technical Details. | Electronic or other method, as agreed. |
3.5.4.2 |
| Obtain for Settlement Period Meter reading of own choosing either a Hand Held Unit or via remote interrogation as appropriate (ensuring that data for the Settlement Period collected does not contain a zero value). | HHDC. |
|
| Internal Process. |
3.5.4.3 |
| Send raw HH Metered Data or notification that Metered Data cannot be collected. | HHDC. | SVA MOA. | D0001 Request Metering System Investigation. D0003 Half Hourly Advances. | Electronic or other method, as agreed. |
REF | WHEN 45 46 | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD | |
| 3.5.5.1 | In accordance with timescales in Appendix 4.6. | Send notification of successful proving test / re-test. Proceed to process 3.4. | SVA MOA. | HHDC, Supplier, LDSO. | D0214 Confirmation of Proving Tests. | Electronic or other method, as agreed. |
| 3.5.5.2 | In accordance with timescales in Appendix 4.6. | Send notification that proving test / re-test failed. | SVA MOA. | HHDC. | D0002 Fault Resolution Report or Request for Decision on Further Action. | Electronic or other method, as agreed. |
REF | WHEN | ACTION | FROM | TO | INFORMATION REQUIRED | METHOD |
3.5.6.1 | As appropriate | Receive request to validate Complex Site data | SVA MOA | HHDC | D0005 Instruction on Action | Electronic or other method, as agreed |
3.5.6.2 | Within 5WD of 3.5.6.1 | Collect Metered Data and aggregate in accordance with the Complex Site rules.
Send Metered Volumes from each Meter in the Complex Site Rule
Send Aggregated Output of Complex Site Rule | HHDC | SVA MOA |
D0003 Half Hourly Advances
Email with aggregated consumption data for the day requested in 3.5.6.1
| Electronic or other method, as agreed. |
3.5.6.3 | Within 2WD of 3.5.6.2 | Validate Metered Volumes and Aggregate Output of Complex Site Rule | SVA MOA |
|
| Internal Process |
3.5.6.4 | Within 2 WD of 3.5.6.3 if data is validated | Send notification confirmation of both metered volumes and aggregated output of Complex Site validation rule. | SVA MOA | HHDC Supplier | D0214 Conformation of Proving Tests | Electronic or other method, as agreed. |
3.5.6.5 | Within 2 WD of 3.5.6.3 if data is not validated | Send notification of failure of confirmation of either metered volumes or aggregated output of Complex Site Rule | SVA MOA | HHDC Supplier | D0002 Fault Investigation | Electronic or other method, as agreed. |
3.5.6.6 | At the same time as 3.5.6.5 | Investigate discrepancy with HHDC and resolve. Proceed to 3.5.6.1 | SVA MOA | HHDC | D0002 Fault Resolution Report or Request for Decision on Further Action. | Electronic or other method, as agreed. |
3.5.6.7 | Within 5 WD of 3.5.6.6 if remains not validated. | Proceed to the Metering System Investigation Process (3.4.3). | HHDC |
|
| Internal Process |
CoP | Max. kW | Max kWh / Half Hour | Permissible Allowed: kWh per Half Hour |
1 | 675,000 | 337,500 | 400,000 |
2 | 100,000 | 50,000 | 50,000 |
3 | 10,000 | 5,000 | 5,000 |
5 | 1,000 | 500 | 600 |
6 & 7 | 76 | 38 | 50 |
10 | 76 | 38 | 50 |
use actual consumption data if the energy has exceeded the permissible allowed by no more than 20%; or
use estimated consumption data, rather than the actual consumption data if the energy exceeded the permissible allowed by more than 20%.
1. | Any evidence of suspected faults to the MS including phase/fuse failure. |
2. | Any evidence of damage to metering and associated equipment. |
3. | Any evidence of tampering of any sort with the MS or associated equipment, particularly seals. |
4. | Any evidence of supply being taken when the Meters are de-energised. |
0 | For an Equivalent Meter |
Max ( 0, E – V – A) | For all other MSIDs where a value of E can be calculated |
0 | Otherwise |
E is an estimate of the volume that would have flowed through the MSID without a disconnection, and is calculated in accordance with (in order of preference) 4.2.1(f), 4.2.1(g) or 4.2.1(h) for import meters, or 4.2.2(g) for export meters – where an estimate is required but cannot be calculated, E should equal zero;
V is the estimate of volume reduction achieved through a demand side non-BM STOR as reported by the SVAA in the D0375 data flow (or zero if none was reported). For the avoidance of doubt, any non-BM STOR MSID reported in a D0375 sent by the SVAA will be an Active Import site only. Therefore (if not reported) the Measurement Quantity ID for any Estimated HH Demand Disconnection Volume reported by the SVAA in the D0375 is AI. Where no value of V is available, V should equal zero; and
A is the actual metered value in the Settlement Period, or an estimate calculated in accordance with (in order of preference) 4.2.1(a), 4.2.1(b) or 4.2.1(c) for import meters, or 4.2.2(b), 4.2.2(c) or 4.2.2(d) for export meters – where an estimate is required but cannot be calculated, A should equal zero;
Scenario | Action |
Multiple P0238s |
|
Demand Control Event ID – different LDSO MPID - different | Treat new P0238 as though a new Demand Control Event |
Demand Control Event ID – same LDSO MPID - same | Treat new P0238 as replacement of earlier P0238 |
Demand Control Event ID – different LDSO MPID - same | Treat new P0238 as though a new Demand Control Event |
Demand Control Event ID – same LDSO MPID - different | Treat new P0238 as incremental set of MSIDs to earlier P0238 MSIDs |
Multiple D0375s |
|
In all cases the HHDC first checks a new D0375’s Demand Control Event ID against existing P0238 Demand Control Event Id. Where no corresponding P0238 or where D0375 contains MSIDs that are not in P0238, the HHDC rejects new D0375. HHDC should raise issue with SVAA via the BSC Service Desk. | |
Demand Control Event ID - different | Treat new D0375 as though a new Demand Control Event. |
Demand Control Event ID - same | Treat new D0375 as replacement of earlier D0375. |
for the Interim Information Volume Allocation the HHDC sends data for all Meter periods for all relevant MSIDs; the data may be actual or estimated.
for the Initial Volume Allocation and subsequent reconciliation(s) the HHDC shall send updates only for this data.
Data Flag | Description |
A | Actual data (read automatically or manually) |
E | Estimated data |
The HHDC suspects invalid MTD on the D0268 Half Hourly Meter Technical Details;
The HHDC has reason to suspect data retrieved from a MS;
The Supplier is responding to an alert from an SVA metering System enrolled by the DCC;
The Supplier cannot establish communication with an SVA metering System enrolled by the DCC;
Data retrieved from a MS failed validation and/or Meter Advance Reconciliation;
Consumption data is detected on a MS registered as de-energised;
The HHDC is unable to resolve an issue in retrieving data from a MS;
Data required for a proving test cannot be obtained;
Consumption data is flagged with an alarm; and/or
At the request of the Supplier.
Outstation Id;
Meter Id (serial number);
Outstation number of channels;
Measurement Quantity Id;
Meter multiplier;
Pulse multiplier;
CT and / or VT Ratios; and
Access to Metering Equipment at Password level 3.
As a result of new connection or Registration Transfers from CMRS to SMRS;
Following a change of HHDC but only in the event that the MTD was manually intervened;
Following a change of SVA MOA appointment but only in the event that the MTD was manually intervened;
Following a concurrent Change of Supplier and HHDC but only in the event that the MTD was manually intervened;
When a MS is reconfigured / replaced;
Following a change of Measurement Class from NHH to HH;
When there is a Key field change (refer to Appendix 4.5);
Where there has been a Key field change (refer to Appendix 4.5) whilst a site has been de-energised and the MS becomes energised;
Where a feeder is energised for the first time; or
Where a Complex Site is created, modified or removed, or where one of the above changes impacts on a MS which is part of a Complex Site.
Code of Practice | WD to Complete Proving Test 54 | WD to Complete Re-Test | Total |
One | 5 | 5 | 10 |
Two | 5 | 5 | 10 |
Three | 10 | 10 | 20 |
Five | 15 | 15 | 30 |
Ten | 15 | 15 | 30 |
MAR confirmation;
MAR failure; and
MAR overdue,
Customer 1’s HH advances: Y
Private network owner’s HH advances (Boundary Point Meter): Z - Y
Boundary Point Supplier: The Supplier appointed at the Boundary Point of the private network; usually appointed by the private network owner;
Boundary Point Meter: Code of Practice (CoP) Compliant Settlement Meter at the Boundary Point;
Third Party Supplier: A Supplier appointed by a customer on the private network;
Third Party Meter: CoP compliant Settlement Meter for the customer on the private network; and
Non Settlement Meter: A meter that is not registered for Settlement purposes.
Be HH Settled;
Appoint and maintain the same SVA MOA as the Boundary Point Supplier;
Appoint and maintain the same HHDC as the Boundary Point Supplier; and
Account for electrical losses between the Defined Metering Point (DMP) and the Actual Metering Point (AMP). (DMP and AMP are definitions taken from the CoPs)
By the appropriate application of factors either within the Meters as compensations or within the HHDC system as constants identified within the complex site supplementary information (REC Complex Site Supplementary Information Form or
No adjustment of Third Party Meter HH advances for losses on the private network. This means that all such losses remain the responsibility of the Boundary Point Supplier for BSC purposes (but does not preclude the private network owner from including an allowance for losses on the private network in the use of system charges made to Third Party Suppliers and/or customers).
| Max. kW | Max kWh / Half Hour | Permissible Allowed: kWh per Half Hour |
SMETS compliant meter | 76 | 38 | 50 |
use actual consumption data if the energy has exceeded the permissible allowed by no more than 20%; or
use estimated consumption data, rather than the actual consumption data if the energy exceeded the permissible allowed by more than 20%.
Serial | Sender | Process | Sub-Process | Recipient | Performance Measure | Service Levels | Reporting Method |
HC01 | HHDC | 3.4 Collection Activities | HH Estimates at RF | HHDA | Extent of estimated data submitted for Final Reconciliation | 100% of estimated data at RF to be based upon techniques (a) – (e) as described in BSCP502 Section 4.2 | Provision of data under PSL100 |
HC02 | Old HHDC | 3.2 Registration Activities | HH Read History to New HHDC | New HHDC | D0036 issued within timescales | 100% issued within 5WD of request | Provision of data under PSL100 |
1 The section numbering used in this BSC Procedure must not change in order to keep this document in line with the referencing used in the other BSCPs listed in Section 1.5.
2 Applies to Half Hourly (HH SVA MOA) and/or Non-Half Hourly (NHH SVA MOA)
3 On receipt of any new MDD, the HHDC shall ensure that all MDD affecting the accuracy of Settlement which is manually entered by the HHDC shall be validated against the source data supplied by the SVAA to the HHDC by means of double entry keying before the data is recorded by the HHDC and used in performing its functions.
4 In the event of any dispute as to whether an item of MDD is appropriate or, as the case may be, affects the accuracy of Settlement, the decision of the Panel shall be conclusive.
5 If a Registration Transfer from CMRS, proceed in accordance with BSCP68, Section 3.2
6 The D0155 can be used to inform the HHDC of the Supplier read schedule for SMETS Meters by notifying the Retrieval Method of ‘S’ and an appropriate value of Regular Reading Cycle. If the D0155 is received by the HHDC, there is no need to send D0012.
7 Refer to Appendix 4.2 for rules on when the EAC should be used by the HHDC for data estimation purposes.
8 The SVA MOA shall provide the energisation status at MS or feeder level. If the energisation status is provided at feeder level, the HHDC shall assume that the MS is de-energised if all feeders are de-energised, and energised if one or more feeders is energised
9 Not required for Supplier serviced Metering Systems.
10 The D0155 shall be used to inform the HHDC of the Supplier read schedule for SMETS Meters by notifying the Retrieval Method of ‘S’ and an appropriate value of Regular Reading Cycle.
11 The new HHDC should not send the D0170 flow prior to the HHDC Effective From Date on their D0155 ‘Notification of Meter Operator or Data Collector Appointment and Terms’ flow received from their associated Supplier.
12 This Meter Advance Reconciliation will require historic HH Metered Data from the old HHDC, and the new HHDC shall therefore ensure that step 3.2.4.7 is carried out in time for this data to be received.
13 No further action required for Supplier-serviced Metering Systems
14 This Meter Advance Reconciliation will require historic HH Metered Data from the old HHDC, and the new HHDC shall therefore ensure that step 3.2.4.8 is carried out in time for this data to be received
15 This process can also be used where there is only a CoMC, not a coincident CoS and CoMC.
16 Where there is a CoMC only, the HHDC shall be appointed from the date of the actual CoMC.
17 Where there is a coincident CoS and CoMC, the HHDC shall be appointed from the Supply Start Date (SSD).
18 Meter changes do not normally occur at midnight, therefore the HHDC should estimate consumption (in accordance with Appendix 4.2) from midnight of their appointment date until confirmation of the Meter change is received. To prevent “double counting” of consumption, the HHDC shall use a ‘zero’ advance between midnight on the SSD and the time of the Meter reading provided by the SVA HH MOA.
19 An initial Meter reading is required for a co-incident CoS and CoMC. It is optional for a CoMC only.
20 If the LDSO carried out the energisation then the SVA MOA shall only send the D0139 to the HHDC.
21 If an HHDC is aware that their record of the energisation status of a Metering System is inconsistent with the energisation status of the Metering system on site, the HHDC should notify both the SVA MOA and the Supplier as soon as possible after becoming aware of the inconsistency, by email or another method, as agreed.
22 For Registration Transfers from SMRS to CMRS use process described in BSCP68, Section 3.1
23 For Supplier-serviced Metering Systems, the reconfiguration and replacement processes are set out in REC Metering Operations Schedule.
24 This process shall only be used for multi-feeder sites. Where a single feeder site is to be energised or de-energised, processes 3.3.1 or 3.3.2 shall be used as appropriate.
25 The LDSO may perform this role.
26 The HHDC shall retrieve data from the Meter as soon as possible before historical data is overwritten.
27 The HHDC shall provide data for a re-run authorised and timetabled by the Panel, as required.
28 The HHDC shall transfer the complete active data for a SVA MSID to the HHDA to enable the Supplier to meet its obligations under the SVAA Calendar. The HHDC shall send to the HHDA:
(i) for the Interim Information Volume Allocation, data for all Meter Period Values for all SVA MSIDs, which data may be actual or estimated; and
(ii) for the Initial Volume Allocation and for reconciliations subsequent to Initial Volume Allocation, updates of this data where the data has changed
29 The dataflow(s) to be used shall be those as agreed between the sender and recipients.
30 HHDCs only need to send the D0010 when the HHDC has actual read data. If data cannot be obtained, then HHDC should not send estimated data to the LDSO.
31 The D0001 ‘Request Metering System Investigation’ can be used to notify the Supplier of the inconsistency if appropriate.
32 Where the inconsistency was identified by a Participant other than the HHDA via the D0235 ‘Half Hourly Aggregation Exception Report’, the Supplier shall send the relevant Participant the resolution of inconsistency report within 5WD of receiving the D0002 ‘Fault Resolution Report or Request for Decision on Further Action’. The Supplier shall use the D0002 for this notification where the Participant initially notified the Supplier of the inconsistency via the D0001 ‘Request Metering System Investigation’.
33 For Measurement Classes F and G, the HHDC should not send the D0036 or D0275 to the LDSO but instead send the D0010 in accordance with the timescales and processes in 3.4.1.12 above.
34 The HHDC should contact and liaise with the Supplier if appropriate.
35 The D0005 ‘Instruction on Action’ should always be sent containing the high level points so that an audit trail can be maintained. For complex cases where the D0005 is not sufficient, or where requested by the HHDC, further details can be given in the fault resolution plan. In these instances the sending of the fault resolution plan should be referred to in the D0005. Any other correspondence between the Supplier, SVA MOA and HHDC which is required to resolve the fault should be sent in a format and by a method agreed by those Participants involved.
36 The Supplier and HHDC should agree whether this will be via normal weekly or monthly reporting, or by a specific report
37An affected MSID is any MSID that an LDSO disconnects due to a Demand Control Event. The period of disconnection should match the length of the DCE as reported by NETSO in its Demand Control Imminent Notification(s), regardless of the actual period of disconnection.
38 Whilst the P0238 is sent by the LDSO to the BSCCo, it should be generated by the LDSO as though it is to be sent direct to Party Agents, i.e. the ‘MPID To’ in the header should reflect the various agents that are intended to receive the file.
39 Please see Appendix 4.2.5 for guidance on populating the D0375.
40 The HHDC should only send a D0375 where it is appointed to at least one MSID listed in the P0238. Where it is not appointed to any affected MSIDs, the HHDC does not need to send a D0375.
41 Demand side Non-BM STOR and DSBR MSIDs will only ever be Active Import MSIDs. Therefore any estimated volumes of reduction reported by the SVAA to the HHDC will be an AI value.
42 These processes can also be used where Suppliers obtain Half Hourly data from SMETS compliant Meters using alternative service providers to the HHDC or DCC
43 The SVA MOA shall decide what proving method is appropriate in conjunction with the HHDC.
44 MS assigned to Measurement Class F, or where Half Hourly data is sourced by the Supplier from a Meter compliant with the SMETS, are exempt from proving tests, except for Complex Sites which are subject to the Complex Site Validation Test.
45 All timescales in this process are undertaken in accordance with Appendix 4.5.
46 In the case of a Registration Transfer from CMRS to SMRS, the proving test shall be performed in accordance with the timescale described in BSCP68, Section 3.2.
47 The HHDC shall use all reasonable endeavours to collect the data for the Settlement Period requested.
48 The SVA MOA does not specify the Settlement Periods to be collected by the HHDC.
49 Described as performing a mini-MAR.
50 ‘Actual’ data means collected Metered Data – ‘A’ flagged – which has successfully passed a main / check data comparison (in accordance with Appendix 4.1.7) and Maximum validation (in accordance with Appendix 4.1.6).
51 For the avoidance of doubt, the data estimation method may be provided using the D0022 Additional Information Field, or by any other method agreed between the HHDC, Supplier and LDSO (e.g. spreadsheets, emails) providing that an audit trail of such information is maintained.
52 That is, an Active Import or Active Export MSID.
53 Ideally this should be the latest Settlement Period for which non-zero data is available. This is to prevent the data from being overwritten in the Meter’s memory before the SVA MOA has had time to collect it.
54 The starting date for this time is either the Date of Meter Installation, the Date of Commissioning, the Effective From Date of the Meter, the Effective Date of a Change of Agent as described in Section 4.6.1, or the date when a Metering System becomes energised where there has been a key field change whilst the Metering System was de-energised, whichever is the later.
55 For the avoidance of doubt, where the MOA has indicated that a Metering System is Complex, then the Complex Site Supplementary Information Form shall be mandatory and the Complex Site mapping details shall not be provided by any means other than the Complex Site Supplementary Information Form.